If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114040604002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.876811,"lon":-110.545276,"icon":""}]} |
Location: 00/04-06-011-04W4/2 | |
Location Alias: 00/04-06-11-04 W4M | |
Location Alias 2: 00/04-06-011-04 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 04 | |
Section: 06 | |
County/Municipality: Cypress County | |
Well Name: SLE MEDHAT 4-6-11-4 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0083843 | |
License Date: 1980-06-27 | |
License Status: Abandoned | |
Spud Date: 1980-07-26 | |
Final Drill Date: 1980-07-30 | |
Well Total Depth: 841.00 m | |
Surface Hole Latitude: 49.876811 | |
Surface Hole Longitude: -110.545276 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-06-27 | Obtained License |
1980-07-30 | Finished Drilling |
1980-07-30 | Well Mode changed to Drilled and Cased |
1980-07-31 | Production Casing Operation Performed |
1980-10-15 | Perforation Treatment Performed - Jet Perforation |
1980-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-16 | Perforation Treatment Performed - Fractured |
1984-01-28 | Perforation Treatment Performed - Jet Perforation |
1984-01-31 | Perforation Treatment Performed - Jet Perforation |
1984-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-05-07 | Well Began Production |
1984-05-07 | Well Fluid changed to Gas |
1984-05-07 | Well Mode changed to Flowing |
1997-01-01 | Well Fluid changed to Gas |
1997-01-01 | Well Mode changed to Suspended |
1997-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-08-20 | Perforation Treatment Performed - Cement Plug |
1997-08-20 | Perforation Treatment Performed - Cement Squeeze |
1997-08-20 | Plug Back Performed |
1997-08-20 | Well Fluid changed to Gas |
1997-08-20 | Well Mode changed to Abandoned Zone |
1997-08-21 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-10-15 | Perforation | 486.50 | 488.50 | 6 |
1997-08-20 | Cement Plug | 775.00 | 782.30 | 0 |
1997-08-20 | Packing Device Capped w/Cement | 468.30 | 476.30 | 0 |
1980-10-15 | Perforation | 489.50 | 491.50 | 6 |
1980-10-16 | Acid Treatment | 486.50 | 491.50 | 0 |
1980-10-16 | Fracture | 486.50 | 491.50 | 0 |
1984-01-28 | Perforation | 807.00 | 807.50 | 4 |
1984-01-31 | Perforation | 807.00 | 807.50 | 4 |
1984-02-02 | Acid Treatment | 807.00 | 807.50 | 0 |
1984-03-22 | Acid Treatment | 807.00 | 807.50 | 0 |
1997-08-20 | Cement Squeeze | 807.00 | 807.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 4010 | 0.0 | 0.0 | 0.0 |
1985 | 6550 | 0.0 | 0.0 | 0.0 |
1986 | 5986 | 0.0 | 0.0 | 0.0 |
1987 | 6024 | 0.0 | 0.0 | 0.0 |
1988 | 744 | 0.0 | 0.0 | 0.0 |
1994 | 4344 | 0.0 | 0.0 | 0.0 |
1995 | 4820 | 0.0 | 0.0 | 0.0 |
1996 | 7319 | 0.0 | 0.0 | 0.0 |
For data sources see[5]