X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104240216000

Well Details

Well ID: 0104240216000
Loading map...
Location: 00/16-02-010-24W4/0
Location Alias: 00/16-02-10-24 W4M
Location Alias 2: 00/16-02-010-24 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 24
Section: 02
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: TORC HZ PENNY 16-2-10-24
Operator Name: TORC Oil & Gas Ltd.
License Number: 0438800
License Date: 2011-11-14
License Status: Issued
Spud Date: 2011-11-21
Final Drill Date: 2011-12-18
Well Total Depth: 3378.00 m
Surface Hole Latitude: 49.786690
Surface Hole Longitude: -113.141993

For data sources see[1][2]

Well History

Date Event
2011-11-14 Obtained License
2011-11-24 Surface Casing Operation Performed
2011-11-29 Direction Drilling Operation Performed - Horizontal
2011-12-02 Well Log Performed
2011-12-05 Intermediate Casing Operation Performed
2011-12-09 Well Log Performed
2011-12-18 Finished Drilling
2011-12-18 Well Log Performed
2011-12-18 Well Mode changed to Drilled and Cased
2011-12-21 Well Log Performed
2011-12-22 Liner Casing Operation Performed
2011-12-23 Rig Released
2012-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-16 Perforation Treatment Performed - Open-Hole Completion
2012-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-31 Well Log Performed
2012-05-07 Well Began Production
2012-05-07 Well Fluid changed to Crude Oil
2012-05-07 Well Mode changed to Flowing
2017-06-01 Well Fluid changed to Crude Oil
2017-06-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-29 1783.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-16 Open Hole/Barefoot Completion 3373.00 3378.00 0
2012-01-20 Multi-Stage Fracture 2815.00 2815.10 0
2012-01-20 Multi-Stage Fracture 2753.90 2754.00 0
2012-01-20 Multi-Stage Fracture 2703.20 2703.30 0
2012-01-20 Multi-Stage Fracture 2638.40 2638.50 0
2012-01-20 Multi-Stage Fracture 2573.50 2573.60 0
2012-01-20 Multi-Stage Fracture 2509.50 2509.60 0
2012-01-20 Multi-Stage Fracture 2458.90 2459.00 0
2012-01-20 Multi-Stage Fracture 2394.50 2394.60 0
2012-01-20 Multi-Stage Fracture 2333.40 2333.50 0
2012-01-20 Multi-Stage Fracture 2269.90 2270.00 0
2012-01-16 Multi-Stage Fracture 3354.50 3354.60 0
2012-01-21 Multi-Stage Fracture 2210.10 2210.20 0
2012-01-21 Multi-Stage Fracture 2150.30 2150.40 0
2012-01-16 Multi-Stage Fracture 3249.30 3249.40 0
2012-01-16 Multi-Stage Fracture 3185.00 3185.10 0
2012-01-16 Multi-Stage Fracture 3123.70 3123.80 0
2012-01-16 Multi-Stage Fracture 3061.50 3061.60 0
2012-01-16 Multi-Stage Fracture 3001.50 3001.60 0
2012-01-16 Multi-Stage Fracture 2936.70 2936.80 0
2012-01-16 Multi-Stage Fracture 2887.00 2887.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2437 0.0 0.0 0.0
2013 7879 0.0 0.0 0.0
2014 5128 0.0 0.0 0.0
2015 6381 0.0 0.0 0.0
2016 3686 0.0 0.0 0.0
2017 8686 0.0 0.0 0.0
2018 8699 0.0 0.0 0.0
2019 8693 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[6]

References