X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104212704003

Well Details

Well ID: 0104212704003
Loading map...
Location: 00/04-27-010-21W4/3
Location Alias: 00/04-27-10-21 W4M
Location Alias 2: 00/04-27-010-21 W4/03
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 21
Section: 27
County/Municipality: Lethbridge County
Well Name: TAC LEOPARD 4-27-10-21
Operator Name: Tamarack Acquisition Corp.
License Number: 0268595
License Date: 2002-03-13
License Status: Issued
Spud Date: 2002-03-18
Final Drill Date: 2002-03-21
Well Total Depth: 1082.00 m
Surface Hole Latitude: 49.844069
Surface Hole Longitude: -112.773310

For data sources see[1][2]

Well History

Date Event
2002-03-13 Obtained License
2002-03-19 Surface Casing Operation Performed
2002-03-21 Finished Drilling
2002-03-21 Well Log Performed
2002-03-21 Well Mode changed to Drilled and Cased
2002-03-22 Production Casing Operation Performed
2002-03-22 Rig Released
2002-03-24 Perforation Treatment Performed - Jet Perforation
2002-03-24 Well Log Performed
2002-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-25 Perforation Treatment Performed - Jet Perforation
2002-03-25 Plug Back Performed
2002-03-25 Well Log Performed
2002-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-26 Perforation Treatment Performed - Jet Perforation
2002-03-26 Plug Back Performed
2002-03-26 Well Log Performed
2002-03-27 Perforation Treatment Performed - Fractured
2002-04-01 Well Fluid changed to Gas
2002-04-01 Well Mode changed to Testing
2002-04-04 Well Began Production
2002-04-04 Well Fluid changed to Gas
2002-04-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-24 Perforation 997.00 999.00 17
2002-03-25 Packing Device Capped w/Cement 984.00 992.00 0
2002-03-25 Perforation 926.50 929.00 17
2002-03-26 Packing Device Capped w/Cement 915.00 923.00 0
2002-03-26 Perforation 900.00 902.50 17
2002-03-27 Fracture 900.00 902.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6488 0.0 0.0 0.0
2003 8522 0.0 0.0 0.0
2004 8496 0.0 0.0 0.0
2005 8325 0.0 0.0 0.0
2006 7232 0.0 0.0 0.0
2007 8186 0.0 0.0 0.0
2008 7885 0.0 0.0 0.0
2009 6820 0.0 0.0 0.0
2010 8562 0.0 0.0 0.0
2011 7971 0.0 0.0 0.0
2012 8675 0.0 0.0 0.0
2013 8272 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 7025 0.0 0.0 0.0
2017 8351 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References