X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104212215003

Well Details

Well ID: 0104212215003
Loading map...
Location: 00/15-22-010-21W4/3
Location Alias: 00/15-22-10-21 W4M
Location Alias 2: 00/15-22-010-21 W4/03
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 21
Section: 22
County/Municipality: Lethbridge County
Well Name: TAC LEOPARD 15-22-10-21
Operator Name: Tamarack Acquisition Corp.
License Number: 0268446
License Date: 2002-03-07
License Status: Amended
Spud Date: 2002-03-12
Final Drill Date: 2002-03-16
Well Total Depth: 1056.00 m
Surface Hole Latitude: 49.837761
Surface Hole Longitude: -112.760981

For data sources see[1][2]

Well History

Date Event
2002-03-07 Obtained License
2002-03-13 Surface Casing Operation Performed
2002-03-14 Direction Drilling Operation Performed - Deviate
2002-03-16 Finished Drilling
2002-03-16 Well Log Performed
2002-03-16 Well Mode changed to Drilled and Cased
2002-03-17 Production Casing Operation Performed
2002-03-17 Rig Released
2002-03-19 Perforation Treatment Performed - Jet Perforation
2002-03-22 Perforation Treatment Performed - Fractured
2002-03-23 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-03-23 Perforation Treatment Performed - Jet Perforation
2002-03-23 Well Log Performed
2002-03-26 Perforation Treatment Performed - Jet Perforation
2002-03-26 Well Log Performed
2002-03-27 Perforation Treatment Performed - Fractured
2002-03-29 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-04-01 Well Fluid changed to Gas
2002-04-01 Well Mode changed to Testing
2002-04-04 Well Began Production
2002-04-04 Well Fluid changed to Gas
2002-04-04 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-03-14 353.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-19 Perforation 915.00 918.00 17
2002-03-22 Fracture 915.00 918.00 0
2002-03-23 Bridge Plug, No Cement 909.00 910.00 0
2002-03-23 Perforation 883.70 886.30 17
2002-03-26 Perforation 858.70 862.00 17
2002-03-27 Fracture 858.70 862.00 0
2002-03-29 Bridge Plug, No Cement 881.20 881.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6319 0.0 0.0 0.0
2003 8651 0.0 0.0 0.0
2004 6085 0.0 0.0 0.0
2005 5488 0.0 0.0 0.0
2006 4606 0.0 0.0 0.0
2007 7706 0.0 0.0 0.0
2008 8286 0.0 0.0 0.0
2009 7660 0.0 0.0 0.0
2010 8705 0.0 0.0 0.0
2011 8639 0.0 0.0 0.0
2012 8684 0.0 0.0 0.0
2013 8488 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 7000 0.0 0.0 0.0
2017 8351 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References