X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104183206002

Well Details

Well ID: 0104183206002
Loading map...
Location: 00/06-32-010-18W4/2
Location Alias: 00/06-32-10-18 W4M
Location Alias 2: 00/06-32-010-18 W4/02
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 18
Section: 32
County/Municipality: Municipal District of Taber
Well Name: CNRL TURIN 6-32-10-18
Operator Name: Canadian Natural Resources Limited
License Number: 0106576
License Date: 1984-03-19
License Status: Abandoned
Spud Date: 1984-03-31
Final Drill Date: 1984-04-08
Well Total Depth: 1194.30 m
Surface Hole Latitude: 49.866277
Surface Hole Longitude: -112.413080

For data sources see[1][2]

Well History

Date Event
1984-03-19 Obtained License
1984-03-31 Direction Drilling Operation Performed - 98
1984-04-08 Finished Drilling
1984-04-09 Well Log Performed
1984-04-10 Drill Stem Test Performed
1984-04-10 Well Log Performed
1984-04-11 Drill Stem Test Performed
1984-04-12 Production Casing Operation Performed
1984-04-29 Perforation Treatment Performed - Jet Perforation
1987-07-16 Perforation Treatment Performed - Jet Perforation
1987-07-16 Well Log Performed
1987-07-18 Perforation Treatment Performed - Jet Perforation
1987-07-18 Well Log Performed
1987-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-11 Well Log Performed
1989-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-06 Perforation Treatment Performed - Cement Squeeze
1989-06-06 Plug Back Performed
1989-06-09 Perforation Treatment Performed - Cement Squeeze
1989-06-12 Perforation Treatment Performed - Open-Hole Completion
1989-08-25 Perforation Treatment Performed - Open-Hole Completion
1989-08-25 Well Log Performed
1989-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-26 Perforation Treatment Performed - Jet Perforation
1989-08-26 Well Log Performed
1989-09-14 Well Log Performed
1989-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-18 Well Mode changed to Drilled and Cased
1990-05-05 Well Began Production
1990-05-05 Well Fluid changed to Water
1990-05-05 Well Type changed to Source
1991-06-30 Well Fluid changed to Water
1991-06-30 Well Mode changed to Suspended
1991-06-30 Well Type changed to Source
1992-09-24 Well Fluid changed to Water
1992-09-24 Well Type changed to Source
1998-12-01 Well Fluid changed to Water
1998-12-01 Well Mode changed to Suspended
1998-12-01 Well Type changed to Source
2002-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-10 Well Fluid changed to Water
2002-10-10 Well Mode changed to Abandoned Zone
2002-10-10 Well Type changed to Source
2002-12-12 Perforation Treatment Performed - Jet Perforation
2003-01-25 Perforation Treatment Performed - Jet Perforation
2003-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-24 Perforation Treatment Performed - Jet Perforation
2003-08-24 Well Log Performed
2003-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-25 Perforation Treatment Performed - Jet Perforation
2003-08-27 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-03-31 452.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-04-29 Perforation 1091.00 1093.00 13
1989-08-26 Perforation 1105.50 1106.50 14
1989-08-26 Perforation 1127.50 1129.00 14
1989-08-26 Perforation 1131.50 1132.50 14
1989-08-26 Acid Treatment 1146.00 1161.00 0
1989-09-16 Acid Treatment 1127.50 1133.50 0
2002-10-10 Packing Device Capped w/Cement 1091.00 1099.00 0
2002-12-12 Perforation 1082.00 1083.50 17
2003-01-25 Perforation 1077.00 1078.50 14
2003-08-23 Packing Device Capped w/Cement 1058.00 1066.00 0
2003-08-24 Perforation 289.00 290.00 14
1987-07-16 Perforation 1085.00 1086.00 13
2003-08-25 Perforation 260.00 261.00 14
2003-08-25 Packing Device Capped w/Cement 278.00 282.00 0
2003-08-25 Packing Device Capped w/Cement 243.00 251.00 0
1987-07-18 Perforation 1088.00 1089.00 13
1987-07-20 Acid Treatment 1085.00 1089.00 0
1989-06-06 Acid Treatment 1085.00 1093.00 0
1989-06-06 Cement Squeeze 1085.00 1089.00 0
1989-06-09 Cement Squeeze 1091.00 1093.00 0
1989-06-12 Open Hole/Barefoot Completion 1131.90 1134.00 0
1989-08-25 Open Hole/Barefoot Completion 1131.90 1194.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 4070 0.0 0.0 0.0
1991 2447 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0

For data sources see[6]

References