X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104181305002

Well Details

Well ID: 0104181305002
Loading map...
Location: 00/05-13-010-18W4/2
Location Alias: 00/05-13-10-18 W4M
Location Alias 2: 00/05-13-010-18 W4/02
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 18
Section: 13
County/Municipality: Municipal District of Taber
Well Name: ACANTHUS ET AL TURIN 5-13-10-18
Operator Name: Baytex Energy Ltd.
License Number: 0213191
License Date: 1998-02-09
License Status: Suspension
Spud Date: 1998-05-31
Final Drill Date: 1998-06-03
Well Total Depth: 1061.00 m
Surface Hole Latitude: 49.821940
Surface Hole Longitude: -112.325454

For data sources see[1][2]

Well History

Date Event
1998-02-09 Obtained License
1998-06-01 Surface Casing Operation Performed
1998-06-03 Finished Drilling
1998-06-03 Well Log Performed
1998-06-03 Well Mode changed to Drilled and Cased
1998-06-04 Production Casing Operation Performed
1998-06-04 Rig Released
1998-06-09 Perforation Treatment Performed - Jet Perforation
2002-02-16 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-02-16 Well Log Performed
2002-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-19 Perforation Treatment Performed - Jet Perforation
2002-02-19 Well Log Performed
2002-02-20 Well Log Performed
2002-02-21 Perforation Treatment Performed - Jet Perforation
2002-06-01 Well Began Production
2002-06-01 Well Fluid changed to Gas
2002-06-01 Well Mode changed to Flowing
2003-02-07 Perforation Treatment Performed - Jet Perforation
2003-02-07 Well Log Performed
2013-04-30 Well Fluid changed to Gas
2013-04-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-06-09 Perforation 1023.00 1024.00 3
2002-02-16 Bridge Plug, No Cement 1030.00 1030.50 0
2002-02-16 Bridge Plug, No Cement 1028.00 1028.50 0
2002-02-19 Packing Device Capped w/Cement 1020.00 1022.00 0
2002-02-19 Perforation 1008.40 1011.00 13
2002-02-21 Perforation 1002.00 1005.00 13
2003-02-07 Perforation 996.50 998.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 4843 0.0 0.0 0.0
2003 7196 0.0 0.0 0.0
2004 6696 0.0 0.0 0.0
2005 4805 0.0 0.0 0.0
2006 7408 0.0 0.0 0.0
2007 6605 0.0 0.0 0.0
2008 6988 0.0 0.0 0.0
2009 8683 0.0 0.0 0.0
2010 8648 0.0 0.0 0.0
2011 6576 0.0 0.0 0.0
2012 2880 0.0 0.0 0.0

For data sources see[5]

References