X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104171501020

Well Details

Well ID: 0104171501020
Loading map...
Location: 02/01-15-010-17W4/0
Location Alias: 02/01-15-10-17 W4M
Location Alias 2: 02/01-15-010-17 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 17
Section: 15
County/Municipality: Municipal District of Taber
Well Name: CNRL TABERN 1-15-10-17
Operator Name: Canadian Natural Resources Limited
License Number: 0160341
License Date: 1993-08-12
License Status: Abandoned
Spud Date: 1993-09-17
Final Drill Date: 1993-09-28
Well Total Depth: 1433.00 m
Surface Hole Latitude: 49.822029
Surface Hole Longitude: -112.223165

For data sources see[1][2]

Well History

Date Event
1993-08-12 Obtained License
1993-09-18 Surface Casing Operation Performed
1993-09-22 Direction Drilling Operation Performed - Horizontal
1993-09-24 Well Log Performed
1993-09-25 Production Casing Operation Performed
1993-09-28 Finished Drilling
1993-09-28 Well Mode changed to Drilled and Cased
1993-09-29 Liner Casing Operation Performed
1993-09-29 Perforation Treatment Performed - Slotted Liner or Casing
1993-09-29 Rig Released
1993-10-02 Well Began Production
1993-10-02 Well Fluid changed to Crude Oil
1993-10-02 Well Mode changed to Pumping
1993-10-12 Well Log Performed
2000-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-25 Plug Back Performed
2000-02-25 Well Fluid changed to Crude Oil
2000-02-25 Well Mode changed to Abandoned Zone
2001-03-19 Well Abandoned
2001-03-19 Well Fluid changed to Crude Oil
2001-03-19 Well Mode changed to Abandoned
2004-07-15 Well Log Performed
2004-07-17 Well Log Performed
2004-07-20 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-07-20 Well Log Performed
2004-07-21 Perforation Treatment Performed - Remedial Casing
2004-07-21 Well Log Performed
2004-07-22 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-07-25 Perforation Treatment Performed - Remedial Casing
2004-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-09-22 853.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-09-29 Slotted Liner 1103.00 1433.00 0
2000-02-25 Packing Device Capped w/Cement 1072.00 1080.00 0
2004-07-20 Hydra Jet Perforation 650.00 654.50 5
2004-07-21 Remedial Casing Cementing 650.00 654.00 0
2004-07-22 Hydra Jet Perforation 596.00 604.00 1
2004-07-25 Remedial Casing Cementing 596.00 604.00 0
2004-08-06 Packing Device Capped w/Cement 584.00 592.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1944 0.0 0.0 0.0
1994 8665 0.0 0.0 0.0
1995 8649 0.0 0.0 0.0
1996 8612 0.0 0.0 0.0
1997 8645 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 7081 0.0 0.0 0.0

For data sources see[6]

References