X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104171109000

Well Details

Well ID: 0104171109000
Loading map...
Location: 00/09-11-010-17W4/0
Location Alias: 00/09-11-10-17 W4M
Location Alias 2: 00/09-11-010-17 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 17
Section: 11
County/Municipality: Taber
Well Name: CNRL TABERN 9-11-10-17
Operator Name: Canadian Natural Resources Limited
License Number: 0184800
License Date: 1996-01-19
License Status: Suspension
Spud Date: 1996-01-21
Final Drill Date: 1996-01-26
Well Total Depth: 1105.00 m
Surface Hole Latitude: 49.805420
Surface Hole Longitude: -112.196702

For data sources see[1][2]

Well History

Date Event
1996-01-19 Obtained License
1996-01-22 Direction Drilling Operation Performed - Deviate
1996-01-22 Surface Casing Operation Performed
1996-01-26 Finished Drilling
1996-01-26 Well Log Performed
1996-01-26 Well Mode changed to Drilled and Cased
1996-01-27 Production Casing Operation Performed
1996-01-27 Rig Released
1996-02-01 Perforation Treatment Performed - Jet Perforation
1996-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-02 Perforation Treatment Performed - Jet Perforation
1996-02-02 Plug Back Performed
1996-02-03 Perforation Treatment Performed - Fractured
1996-02-06 Well Began Production
1996-02-06 Well Fluid changed to Crude Oil
1996-02-06 Well Mode changed to Pumping
1996-02-27 Well Log Performed
1997-05-01 Well Fluid changed to Crude Oil
1997-05-01 Well Mode changed to Suspended
1997-09-09 Well Fluid changed to Crude Oil
1997-09-09 Well Mode changed to Pumping
2017-01-31 Well Fluid changed to Crude Oil
2017-01-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-01-22 349.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-01 Perforation 1080.00 1082.00 13
1996-02-02 Packing Device Capped w/Cement 1074.00 1077.00 0
1996-02-02 Perforation 1055.50 1061.50 13
1996-02-02 Perforation 1063.00 1065.50 13
1996-02-03 Fracture 1055.50 1065.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3140 0.0 0.0 0.0
1997 2726 0.0 0.0 0.0
1998 8621 0.0 0.0 0.0
1999 8652 0.0 0.0 0.0
2000 8732 0.0 0.0 0.0
2001 8692 0.0 0.0 0.0
2002 8650 0.0 0.0 0.0
2003 8319 0.0 0.0 0.0
2004 8503 0.0 0.0 0.0
2005 8706 0.0 0.0 0.0
2006 8507 0.0 0.0 0.0
2007 8430 0.0 0.0 0.0
2008 8324 0.0 0.0 0.0
2009 8648 0.0 0.0 0.0
2010 8016 0.0 0.0 0.0
2011 8138 0.0 0.0 0.0
2012 8527 0.0 0.0 0.0
2013 8670 0.0 0.0 0.0
2014 8722 0.0 0.0 0.0
2015 8343 0.0 0.0 0.0
2016 3047 0.0 0.0 0.0

For data sources see[6]

References