X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104171006002

Well Details

Well ID: 0104171006002
Loading map...
Location: 00/06-10-010-17W4/2
Location Alias: 00/06-10-10-17 W4M
Location Alias 2: 00/06-10-010-17 W4/02
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 17
Section: 10
County/Municipality: Municipal District of Taber
Well Name: CNRL TABERN 6-10-10-17
Operator Name: Canadian Natural Resources Limited
License Number: 0167079
License Date: 1994-05-12
License Status: Issued
Spud Date: 1995-08-10
Final Drill Date: 1995-08-15
Well Total Depth: 968.00 m
Surface Hole Latitude: 49.804009
Surface Hole Longitude: -112.230824

For data sources see[1][2]

Well History

Date Event
1994-05-12 Obtained License
1995-08-12 Surface Casing Operation Performed
1995-08-13 Direction Drilling Operation Performed - Deviate
1995-08-15 Finished Drilling
1995-08-15 Production Casing Operation Performed
1995-08-15 Well Log Performed
1995-08-15 Well Mode changed to Drilled and Cased
1995-08-16 Rig Released
1995-08-22 Perforation Treatment Performed - Jet Perforation
1995-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-05 Perforation Treatment Performed - Jet Perforation
1995-09-05 Plug Back Performed
1995-09-07 Well Began Production
1995-09-07 Well Fluid changed to Crude Oil
1995-09-07 Well Log Performed
1995-09-07 Well Mode changed to Pumping
2011-10-27 Perforation Treatment Performed - Cement Squeeze
2011-10-27 Plug Back Performed
2011-10-27 Well Fluid changed to Crude Oil
2011-10-27 Well Mode changed to Abandoned Zone
2011-11-01 Perforation Treatment Performed - Jet Perforation
2011-11-02 Perforation Treatment Performed - Jet Perforation
2011-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-08-13 546.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-22 Perforation 949.50 952.00 13
1995-09-05 Packing Device Capped w/Cement 945.00 948.00 0
1995-09-05 Perforation 930.00 933.50 13
1995-09-05 Perforation 934.00 937.00 13
2011-10-27 Cement Squeeze 930.00 937.00 0
2011-11-01 Perforation 949.50 952.00 13
2011-11-02 Perforation 949.50 952.00 13
2011-11-03 Acid Treatment 949.50 952.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1956 0.0 0.0 0.0
1996 7539 0.0 0.0 0.0
1997 6844 0.0 0.0 0.0
1998 8747 0.0 0.0 0.0
1999 8721 0.0 0.0 0.0
2000 8691 0.0 0.0 0.0
2001 8680 0.0 0.0 0.0
2002 8109 0.0 0.0 0.0
2003 8196 0.0 0.0 0.0
2004 8678 0.0 0.0 0.0
2005 7720 0.0 0.0 0.0
2006 7740 0.0 0.0 0.0
2007 7751 0.0 0.0 0.0
2008 8516 0.0 0.0 0.0
2009 8661 0.0 0.0 0.0
2010 8422 0.0 0.0 0.0
2011 6648 0.0 0.0 0.0

For data sources see[6]

References