X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104170801002

Well Details

Well ID: 0104170801002
Loading map...
Location: 00/01-08-010-17W4/2
Location Alias: 00/01-08-10-17 W4M
Location Alias 2: 00/01-08-010-17 W4/02
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 17
Section: 08
County/Municipality: Municipal District of Taber
Well Name: CNRL TABERN 1-8-10-17
Operator Name: Canadian Natural Resources Limited
License Number: 0161169
License Date: 1993-09-27
License Status: Issued
Spud Date: 1993-09-27
Final Drill Date: 1993-10-01
Well Total Depth: 1030.00 m
Surface Hole Latitude: 49.801901
Surface Hole Longitude: -112.263211

For data sources see[1][2]

Well History

Date Event
1993-09-27 Obtained License
1993-09-27 Surface Casing Operation Performed
1993-09-29 Direction Drilling Operation Performed - Deviate
1993-10-01 Finished Drilling
1993-10-02 Production Casing Operation Performed
1993-10-02 Rig Released
1993-10-02 Well Log Performed
1993-10-12 Perforation Treatment Performed - Jet Perforation
1993-10-13 Perforation Treatment Performed - Fractured
1993-10-28 Well Log Performed
1996-05-29 Perforation Treatment Performed - Fractured
1998-01-02 Perforation Treatment Performed - Cement Squeeze
1998-01-02 Plug Back Performed
1998-01-05 Perforation Treatment Performed - Jet Perforation
1998-01-05 Perforation Treatment Performed - Open-Hole Completion
1998-01-05 Well Mode changed to Drilled and Cased
1998-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-19 Well Log Performed
2011-02-23 Perforation Treatment Performed - Jet Perforation
2011-02-23 Well Log Performed
2011-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-24 Perforation Treatment Performed - Remedial Casing
2011-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-02 Well Log Performed
2011-04-15 Well Began Injection
2011-04-15 Well Fluid changed to Water
2011-04-15 Well Type changed to Disposal
2019-08-31 Well Fluid changed to Water
2019-08-31 Well Mode changed to Suspended
2019-08-31 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-09-29 660.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-10-12 Perforation 987.00 990.00 13
2011-02-23 Perforation 994.00 995.00 13
2011-02-24 Acid Treatment 994.00 995.00 0
2011-02-24 Remedial Casing Cementing 994.00 995.00 0
2011-02-28 Acid Treatment 1016.00 1030.00 0
1993-10-12 Perforation 991.50 993.50 13
1993-10-13 Fracture 987.00 993.50 0
1996-05-29 Fracture 987.00 993.50 0
1998-01-02 Cement Squeeze 987.00 993.50 0
1998-01-05 Open Hole/Barefoot Completion 1026.00 1030.00 0
1998-01-05 Perforation 1023.50 1027.50 13
1998-01-05 Perforation 1016.00 1020.00 13
1998-01-06 Acid Treatment 1016.00 1030.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[6]

References