X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104161806000

Well Details

Well ID: 0104161806000
Loading map...
Location: 00/06-18-010-16W4/0
Location Alias: 00/06-18-10-16 W4M
Location Alias 2: 00/06-18-010-16 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 16
Section: 18
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 6-18-10-16
Operator Name: Canadian Natural Resources Limited
License Number: 0144438
License Date: 1990-06-13
License Status: Issued
Spud Date: 1990-07-10
Final Drill Date: 1990-07-17
Well Total Depth: 995.00 m
Surface Hole Latitude: 49.820135
Surface Hole Longitude: -112.164058

For data sources see[1][2]

Well History

Date Event
1990-06-13 Obtained License
1990-07-11 Surface Casing Operation Performed
1990-07-11 Well Log Performed
1990-07-12 Direction Drilling Operation Performed - Deviate
1990-07-17 Finished Drilling
1990-07-17 Well Log Performed
1990-07-17 Well Mode changed to Drilled and Cased
1990-07-18 Production Casing Operation Performed
1990-07-18 Rig Released
1990-07-20 Well Log Performed
1990-07-25 Well Log Performed
1990-08-01 Well Log Performed
1990-09-02 Well Log Performed
1990-09-03 Perforation Treatment Performed - Jet Perforation
1990-09-03 Well Log Performed
1990-09-04 Well Log Performed
1990-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-06 Perforation Treatment Performed - Jet Perforation
1990-09-14 Well Began Production
1990-09-14 Well Fluid changed to Crude Oil
1990-09-14 Well Mode changed to Pumping
1994-06-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-07-12 381.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-09-03 Perforation 973.00 976.50 13
1990-09-05 Packing Device Capped w/Cement 962.00 970.00 0
1990-09-06 Perforation 940.00 944.00 13
1994-06-05 Perforation 944.00 946.00 13
1994-06-05 Perforation 947.00 950.00 13
1994-06-05 Perforation 951.00 952.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2529 0.0 0.0 0.0
1991 8543 0.0 0.0 0.0
1992 8573 0.0 0.0 0.0
1993 8553 0.0 0.0 0.0
1994 8496 0.0 0.0 0.0
1995 8573 0.0 0.0 0.0
1996 8680 0.0 0.0 0.0
1997 8687 0.0 0.0 0.0
1998 8734 0.0 0.0 0.0
1999 8719 0.0 0.0 0.0
2000 8734 0.0 0.0 0.0
2001 8648 0.0 0.0 0.0
2002 8615 0.0 0.0 0.0
2003 8413 0.0 0.0 0.0
2004 8519 0.0 0.0 0.0
2005 8635 0.0 0.0 0.0
2006 8636 0.0 0.0 0.0
2007 8598 0.0 0.0 0.0
2008 8498 0.0 0.0 0.0
2009 8701 0.0 0.0 0.0
2010 7914 0.0 0.0 0.0
2011 8659 0.0 0.0 0.0
2012 8544 0.0 0.0 0.0
2013 8472 0.0 0.0 0.0
2014 8696 0.0 0.0 0.0
2015 8731 0.0 0.0 0.0
2016 8551 0.0 0.0 0.0
2017 8609 0.0 0.0 0.0
2018 8750 0.0 0.0 0.0
2019 8140 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[6]

References