X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104161406020

Well Details

Well ID: 0104161406020
Loading map...
Location: 02/06-14-010-16W4/0
Location Alias: 02/06-14-10-16 W4M
Location Alias 2: 02/06-14-010-16 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 16
Section: 14
County/Municipality: Municipal District of Taber
Well Name: STRATEGIC 02 TABER 6-14-10-16
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0140820
License Date: 1989-09-05
License Status: Issued
Spud Date: 1989-09-10
Final Drill Date: 1989-09-12
Well Total Depth: 1005.00 m
Surface Hole Latitude: 49.819307
Surface Hole Longitude: -112.070957

For data sources see[1][2]

Well History

Date Event
1989-09-05 Obtained License
1989-09-10 Surface Casing Operation Performed
1989-09-12 Finished Drilling
1989-09-12 Well Mode changed to Drilled and Cased
1989-09-13 Well Log Performed
1989-09-14 Production Casing Operation Performed
1989-09-14 Rig Released
1989-09-21 Well Log Performed
1989-09-22 Perforation Treatment Performed - Jet Perforation
1989-11-21 Well Began Production
1989-11-21 Well Fluid changed to Crude Oil
1989-11-21 Well Mode changed to Flowing
1990-06-01 Well Fluid changed to Crude Oil
1990-06-01 Well Mode changed to Suspended
1990-09-01 Well Fluid changed to Crude Oil
1990-09-01 Well Mode changed to Flowing
1991-10-16 Well Fluid changed to Crude Oil
1991-10-16 Well Mode changed to Suspended
1991-12-02 Perforation Treatment Performed - Jet Perforation
1991-12-02 Well Log Performed
1991-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-04 Perforation Treatment Performed - Jet Perforation
1991-12-04 Well Log Performed
1991-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-06 Well Log Performed
1991-12-21 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-09-22 Perforation 961.50 962.50 14
1989-09-22 Perforation 962.80 964.50 14
1991-12-02 Perforation 966.50 970.00 16
1991-12-03 Acid Treatment 961.50 970.00 0
1991-12-04 Perforation 979.00 987.00 16
1991-12-05 Acid Treatment 979.00 987.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 860 0.0 0.0 0.0
1990 6203 0.0 0.0 0.0
1991 5403 0.0 0.0 0.0

For data sources see[5]

References