X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104160915020

Well Details

Well ID: 0104160915020
Loading map...
Location: 02/15-09-010-16W4/0
Location Alias: 02/15-09-10-16 W4M
Location Alias 2: 02/15-09-010-16 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 16
Section: 09
County/Municipality: Municipal District of Taber
Well Name: NEO TABER 15-9-10-16
Operator Name: NEO Exploration Inc.
License Number: 0154215
License Date: 1992-10-23
License Status: Abandoned
Spud Date: 1992-10-28
Final Drill Date: 1992-10-30
Well Total Depth: 639.00 m
Surface Hole Latitude: 49.813406
Surface Hole Longitude: -112.113893

For data sources see[1][2]

Well History

Date Event
1992-10-23 Obtained License
1992-10-28 Surface Casing Operation Performed
1992-10-30 Finished Drilling
1992-10-30 Well Mode changed to Drilled and Cased
1992-10-31 Production Casing Operation Performed
1992-10-31 Rig Released
1992-10-31 Well Log Performed
1992-11-08 Perforation Treatment Performed - Jet Perforation
1992-11-09 Perforation Treatment Performed - Fractured
1992-11-14 Perforation Treatment Performed - Fractured
1992-12-12 Well Began Production
1992-12-12 Well Fluid changed to Gas
1992-12-12 Well Mode changed to Flowing
2012-10-01 Well Fluid changed to Gas
2012-10-01 Well Mode changed to Suspended
2013-06-12 Well Fluid changed to Gas
2013-06-12 Well Mode changed to Flowing
2015-05-01 Well Fluid changed to Gas
2015-05-01 Well Mode changed to Suspended
2018-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-03 Plug Back Performed
2018-10-03 Well Fluid changed to Gas
2018-10-03 Well Log Performed
2018-10-03 Well Mode changed to Abandoned Zone
2019-01-15 Well Abandoned
2019-01-15 Well Fluid changed to Gas
2019-01-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-11-08 Perforation 600.40 603.60 20
1992-11-08 Perforation 605.30 607.40 20
1992-11-09 Fracture 600.40 607.40 0
1992-11-14 Fracture 600.40 607.40 0
2018-10-03 Packing Device Capped w/Cement 585.00 593.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 456 0.0 0.0 0.0
1993 5828 0.0 0.0 0.0
1994 6145 0.0 0.0 0.0
1995 6622 0.0 0.0 0.0
1996 5580 0.0 0.0 0.0
1997 7778 0.0 0.0 0.0
1998 8705 0.0 0.0 0.0
1999 8638 0.0 0.0 0.0
2000 8511 0.0 0.0 0.0
2001 8546 0.0 0.0 0.0
2002 8647 0.0 0.0 0.0
2003 8695 0.0 0.0 0.0
2004 8687 0.0 0.0 0.0
2005 8673 0.0 0.0 0.0
2006 8718 0.0 0.0 0.0
2007 7891 0.0 0.0 0.0
2008 5565 0.0 0.0 0.0
2009 7792 0.0 0.0 0.0
2010 8165 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 4127 0.0 0.0 0.0
2013 4862 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 2687 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References