X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104132904000

Well Details

Well ID: 0104132904000
Loading map...
Location: 00/04-29-010-13W4/0
Location Alias: 00/04-29-10-13 W4M
Location Alias 2: 00/04-29-010-13 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 13
Section: 29
County/Municipality: Municipal District of Taber
Well Name: CHURCHILL BI 4-29-10-13
Operator Name: Ascensun Oil and Gas Ltd.
License Number: 0226256
License Date: 1999-09-13
License Status: Suspension
Spud Date: 1999-09-14
Final Drill Date: 1999-09-21
Well Total Depth: 1034.00 m
Surface Hole Latitude: 49.844390
Surface Hole Longitude: -111.741385

For data sources see[1][2]

Well History

Date Event
1999-09-13 Obtained License
1999-09-15 Direction Drilling Operation Performed - Deviate
1999-09-16 Surface Casing Operation Performed
1999-09-20 Well Log Performed
1999-09-21 Finished Drilling
1999-09-21 Production Casing Operation Performed
1999-09-21 Rig Released
1999-09-21 Well Log Performed
1999-09-21 Well Mode changed to Drilled and Cased
1999-09-27 Perforation Treatment Performed - Jet Perforation
1999-09-27 Well Log Performed
1999-12-10 Well Began Production
1999-12-10 Well Fluid changed to Crude Oil
1999-12-10 Well Mode changed to Pumping
2003-04-01 Well Fluid changed to Crude Oil
2003-04-01 Well Mode changed to Suspended
2006-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-20 Perforation Treatment Performed - Jet Perforation
2006-02-20 Plug Back Performed
2006-02-20 Well Fluid changed to Crude Oil
2006-02-20 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-09-15 200.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-09-27 Perforation 987.00 989.00 18
2006-02-20 Packing Device Capped w/Cement 972.00 980.00 0
2006-02-20 Perforation 703.80 705.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 476 0.0 0.0 0.0
2000 8612 0.0 0.0 0.0
2001 8746 0.0 0.0 0.0
2002 192 0.0 0.0 0.0

For data sources see[6]

References