If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104132604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.846076,"lon":-111.672794,"icon":""}]} |
Location: 00/04-26-010-13W4/0 | |
Location Alias: 00/04-26-10-13 W4M | |
Location Alias 2: 00/04-26-010-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 010 | |
Meridian: 4 | |
Range: 13 | |
Section: 26 | |
County/Municipality: Municipal District of Taber | |
Well Name: JOSS ET AL BOW ISLAND 4-26-10-13 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0148487 | |
License Date: 1991-03-21 | |
License Status: RecCertified | |
Spud Date: 1991-04-09 | |
Final Drill Date: 1991-04-12 | |
Well Total Depth: 949.00 m | |
Surface Hole Latitude: 49.846076 | |
Surface Hole Longitude: -111.672794 |
Date | Event |
---|---|
1991-03-21 | Obtained License |
1991-04-10 | Surface Casing Operation Performed |
1991-04-12 | Finished Drilling |
1991-04-12 | Well Log Performed |
1991-04-12 | Well Mode changed to Drilled and Cased |
1991-04-13 | Production Casing Operation Performed |
1991-04-13 | Rig Released |
1991-05-06 | Well Log Performed |
1991-05-09 | Perforation Treatment Performed - Jet Perforation |
1991-05-09 | Well Log Performed |
1991-05-22 | Well Began Production |
1991-05-22 | Well Fluid changed to Crude Oil |
1991-05-22 | Well Mode changed to Pumping |
1993-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-06-23 | Plug Back Performed |
1993-06-23 | Well Log Performed |
1995-08-09 | Well Abandoned |
1995-08-09 | Well Fluid changed to Crude Oil |
1995-08-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-05-09 | Perforation | 913.50 | 914.50 | 13 |
1993-06-23 | Packing Device Capped w/Cement | 900.00 | 908.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 3376 | 0.0 | 0.0 | 0.0 |
1992 | 2849 | 0.0 | 0.0 | 0.0 |
For data sources see[5]