X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104011110000

Well Details

Well ID: 0104011110000
Loading map...
Location: 00/10-11-010-01W4/0
Location Alias: 00/10-11-10-01 W4M
Location Alias 2: 00/10-11-010-01 W4/00
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 01
Section: 11
County/Municipality: Cypress County
Well Name: ASHLAND WALSH 10-11-10-1
Operator Name: BP Canada Energy Group ULC
License Number: 0045486
License Date: 1973-03-27
License Status: RecCertified
Spud Date: 1973-04-11
Final Drill Date: 1973-04-16
Well Total Depth: 1246.30 m
Surface Hole Latitude: 49.810736
Surface Hole Longitude: -110.035259

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-27 Obtained License
1973-04-11 Lost Circulation Occurred
1973-04-16 Finished Drilling
1973-04-18 Production Casing Operation Performed
1973-05-22 Perforation Treatment Performed - Jet Perforation
1973-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-05-23 Perforation Treatment Performed - Selective Bullet Perforations
1973-05-24 Perforation Treatment Performed - Acid Wash - No Pressure
1973-05-25 Perforation Treatment Performed - Acid Wash - No Pressure
1973-05-25 Perforation Treatment Performed - Selective Bullet Perforations
1973-05-26 Perforation Treatment Performed - Fractured
1973-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-05-29 Perforation Treatment Performed - Selective Bullet Perforations
1973-05-30 Perforation Treatment Performed - Fractured
1973-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-06-04 Perforation Treatment Performed - Fractured
1973-06-04 Perforation Treatment Performed - Selective Bullet Perforations
1973-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-06-08 Well Abandoned
1973-06-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-05-22 Perforation 933.30 933.90 7
1973-05-25 Selective Bullet Perforations 790.30 790.30 0
1973-05-25 Acid Wash 784.60 790.30 0
1973-05-26 Fracture 784.60 825.40 0
1973-05-29 Packing Device Capped w/Cement 777.20 777.20 0
1973-05-29 Selective Bullet Perforations 618.40 619.00 0
1973-05-29 Selective Bullet Perforations 620.90 621.50 0
1973-05-29 Selective Bullet Perforations 621.80 622.10 0
1973-05-29 Selective Bullet Perforations 622.40 622.70 0
1973-05-29 Selective Bullet Perforations 623.00 623.00 0
1973-05-30 Fracture 618.40 623.00 0
1973-05-23 Packing Device Capped w/Cement 929.60 929.60 0
1973-06-04 Packing Device Capped w/Cement 609.60 609.60 0
1973-06-04 Selective Bullet Perforations 497.40 498.00 0
1973-06-04 Selective Bullet Perforations 512.10 512.70 0
1973-06-04 Selective Bullet Perforations 513.30 520.60 0
1973-06-04 Selective Bullet Perforations 521.20 521.80 0
1973-06-04 Selective Bullet Perforations 570.30 570.60 0
1973-06-04 Selective Bullet Perforations 573.60 573.90 0
1973-06-04 Acid Treatment 497.40 573.90 0
1973-06-04 Fracture 497.40 573.90 0
1973-06-08 Packing Device Capped w/Cement 487.70 487.70 0
1973-05-23 Selective Bullet Perforations 823.30 823.60 0
1973-05-23 Selective Bullet Perforations 824.50 824.80 0
1973-05-23 Selective Bullet Perforations 825.10 825.40 0
1973-05-24 Acid Wash 823.30 825.40 0
1973-05-25 Selective Bullet Perforations 784.60 784.90 0
1973-05-25 Selective Bullet Perforations 785.20 786.70 0
1973-05-25 Selective Bullet Perforations 787.00 790.30 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-04-11 Lost Circulation 22.90 22.90

For data sources see[5]

References