X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0095033411004

Well Details

Well ID: 0095033411004
Loading map...
Location: 00/11-34-009-03W5/4
Location Alias: 00/11-34-09-03 W5M
Location Alias 2: 00/11-34-009-03 W5/04
Country: Canada
Province: Alberta
Township: 009
Meridian: 5
Range: 03
Section: 34
County/Municipality: Municipal District of Ranchland No. 66
Well Name: TAC TODD 11-34-9-3
Operator Name: Tamarack Acquisition Corp.
License Number: 0407159
License Date: 2008-12-29
License Status: Amended
Spud Date: 2009-08-21
Final Drill Date: 2009-09-10
Well Total Depth: 2274.00 m
Surface Hole Latitude: 49.786614
Surface Hole Longitude: -114.333466

For data sources see[1][2]

Well History

Date Event
2008-12-29 Obtained License
2009-08-22 Direction Drilling Operation Performed - Deviate
2009-08-25 Surface Casing Operation Performed
2009-09-10 Finished Drilling
2009-09-10 Well Mode changed to Drilled and Cased
2009-09-12 Well Log Performed
2009-09-13 Production Casing Operation Performed
2009-09-15 Rig Released
2009-09-30 Well Log Performed
2009-10-01 Perforation Treatment Performed - Jet Perforation
2009-10-01 Well Log Performed
2009-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-05 Plug Back Performed
2009-10-05 Well Log Performed
2009-10-06 Perforation Treatment Performed - Jet Perforation
2009-10-06 Well Log Performed
2009-10-10 Perforation Treatment Performed - Fractured
2009-10-20 Well Log Performed
2009-10-21 Perforation Treatment Performed - Jet Perforation
2009-10-21 Well Log Performed
2009-11-08 Perforation Treatment Performed - Fractured
2009-11-25 Perforation Treatment Performed - Jet Perforation
2009-11-25 Well Log Performed
2009-11-30 Perforation Treatment Performed - Jet Perforation
2009-11-30 Well Log Performed
2010-01-02 Well Began Production
2010-01-02 Well Fluid changed to Gas
2010-01-02 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-08-22 115.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-01 Perforation 2230.00 2233.00 17
2009-11-30 Perforation 2027.50 2031.50 17
2009-10-05 Packing Device Capped w/Cement 2216.00 2224.00 0
2009-10-06 Perforation 2140.00 2144.00 17
2009-10-10 Fracture 2140.00 2144.00 0
2009-10-21 Perforation 2105.00 2107.00 17
2009-10-21 Perforation 2091.00 2093.00 17
2009-11-08 Fracture 2091.00 2107.00 0
2009-11-25 Perforation 2097.50 2101.50 17
2009-11-25 Perforation 2046.00 2049.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 8167 0.0 0.0 0.0
2011 8591 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8319 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 6940 0.0 0.0 0.0
2017 1024 0.0 0.0 0.0
2019 8375 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References