X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094262316000

Well Details

Well ID: 0094262316000
Loading map...
Location: 00/16-23-009-26W4/0
Location Alias: 00/16-23-09-26 W4M
Location Alias 2: 00/16-23-009-26 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 26
Section: 23
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CHEVRON CDN-SUP NOLAN 16-23-9-26
Operator Name: Chevron Canada Limited
License Number: 0087099
License Date: 1980-11-18
License Status: RecCertified
Spud Date: 1980-12-06
Final Drill Date: 1981-03-19
Well Total Depth: 2620.00 m
Surface Hole Latitude: 49.753974
Surface Hole Longitude: -113.415232

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-18 Obtained License
1981-01-22 Kick Occurred
1981-02-08 Lost Circulation Occurred
1981-02-12 Drill Stem Test Performed
1981-02-24 Drill Stem Test Performed
1981-02-25 Kick Occurred
1981-02-25 Lost Circulation Occurred
1981-03-01 Production Casing Operation Performed
1981-03-06 Drill Stem Test Performed
1981-03-07 Kick Occurred
1981-03-17 Drill Stem Test Performed
1981-03-19 Finished Drilling
1981-03-19 Perforation Treatment Performed - Open-Hole Completion
1981-05-28 Well Mode changed to Drilled and Cased
1981-11-07 Perforation Treatment Performed - Fractured
1982-05-25 Well Began Production
1982-05-25 Well Fluid changed to Crude Oil
1982-05-25 Well Mode changed to Flowing
1982-11-29 Well Fluid changed to Crude Oil
1982-11-29 Well Mode changed to Suspended
1983-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-07-08 Well Abandoned
1983-07-08 Well Fluid changed to Crude Oil
1983-07-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-19 Open Hole/Barefoot Completion 2532.00 2620.00 0
1981-11-07 Fracture 2532.00 2620.00 0
1983-07-08 Packing Device Capped w/Cement 2496.00 2504.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 3294 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-01-22 Kick 1749.00 1749.00
1981-02-08 Lost Circulation 2153.00 2153.00
1981-02-25 Kick 2556.00 2556.00
1981-02-25 Lost Circulation 2556.00 2556.00
1981-03-07 Kick 2574.00 2577.50

For data sources see[6]

References