If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094262316000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.753974,"lon":-113.415232,"icon":""}]} |
Location: 00/16-23-009-26W4/0 | |
Location Alias: 00/16-23-09-26 W4M | |
Location Alias 2: 00/16-23-009-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 26 | |
Section: 23 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: CHEVRON CDN-SUP NOLAN 16-23-9-26 | |
Operator Name: Chevron Canada Limited | |
License Number: 0087099 | |
License Date: 1980-11-18 | |
License Status: RecCertified | |
Spud Date: 1980-12-06 | |
Final Drill Date: 1981-03-19 | |
Well Total Depth: 2620.00 m | |
Surface Hole Latitude: 49.753974 | |
Surface Hole Longitude: -113.415232 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-11-18 | Obtained License |
1981-01-22 | Kick Occurred |
1981-02-08 | Lost Circulation Occurred |
1981-02-12 | Drill Stem Test Performed |
1981-02-24 | Drill Stem Test Performed |
1981-02-25 | Kick Occurred |
1981-02-25 | Lost Circulation Occurred |
1981-03-01 | Production Casing Operation Performed |
1981-03-06 | Drill Stem Test Performed |
1981-03-07 | Kick Occurred |
1981-03-17 | Drill Stem Test Performed |
1981-03-19 | Finished Drilling |
1981-03-19 | Perforation Treatment Performed - Open-Hole Completion |
1981-05-28 | Well Mode changed to Drilled and Cased |
1981-11-07 | Perforation Treatment Performed - Fractured |
1982-05-25 | Well Began Production |
1982-05-25 | Well Fluid changed to Crude Oil |
1982-05-25 | Well Mode changed to Flowing |
1982-11-29 | Well Fluid changed to Crude Oil |
1982-11-29 | Well Mode changed to Suspended |
1983-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-07-08 | Well Abandoned |
1983-07-08 | Well Fluid changed to Crude Oil |
1983-07-08 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-03-19 | Open Hole/Barefoot Completion | 2532.00 | 2620.00 | 0 |
1981-11-07 | Fracture | 2532.00 | 2620.00 | 0 |
1983-07-08 | Packing Device Capped w/Cement | 2496.00 | 2504.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 3294 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1981-01-22 | Kick | 1749.00 | 1749.00 |
1981-02-08 | Lost Circulation | 2153.00 | 2153.00 |
1981-02-25 | Kick | 2556.00 | 2556.00 |
1981-02-25 | Lost Circulation | 2556.00 | 2556.00 |
1981-03-07 | Kick | 2574.00 | 2577.50 |
For data sources see[6]