X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094250206000

Well Details

Well ID: 0094250206000
Loading map...
Location: 00/06-02-009-25W4/0
Location Alias: 00/06-02-09-25 W4M
Location Alias 2: 00/06-02-009-25 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 25
Section: 02
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CZAR ET AL PEARCE 6-2-9-25
Operator Name: Canadian Natural Resources Limited
License Number: 0081984
License Date: 1980-04-03
License Status: RecCertified
Spud Date: 1980-04-11
Final Drill Date: 1980-05-27
Well Total Depth: 2608.00 m
Surface Hole Latitude: 49.705456
Surface Hole Longitude: -113.287938

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-03 Obtained License
1980-04-26 Lost Circulation Occurred
1980-05-24 Drill Stem Test Performed
1980-05-26 Well Log Performed
1980-05-27 Finished Drilling
1980-05-27 Well Mode changed to Drilled and Cased
1980-05-31 Drill Stem Test Performed
1980-06-01 Drill Stem Test Performed
1980-06-03 Drill Stem Test Performed
1980-06-05 Production Casing Operation Performed
1980-07-31 Perforation Treatment Performed - Jet Perforation
1980-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-02 Perforation Treatment Performed - Jet Perforation
1980-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-05 Perforation Treatment Performed - Cement Squeeze
1980-08-05 Perforation Treatment Performed - Jet Perforation
1980-08-11 Perforation Treatment Performed - Fractured
1980-08-13 Perforation Treatment Performed - Jet Perforation
1980-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-16 Perforation Treatment Performed - Fractured
1980-08-19 Perforation Treatment Performed - Cement Squeeze
1980-08-28 Well Began Production
1980-08-28 Well Fluid changed to Crude Oil
1980-08-28 Well Mode changed to Flowing
1980-12-01 Well Fluid changed to Crude Oil
1980-12-01 Well Mode changed to Suspended
1986-05-15 Well Fluid changed to Crude Oil
1986-05-15 Well Mode changed to Pumping
1986-05-20 Well Log Performed
1986-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-05-21 Plug Back Performed
1986-05-21 Well Fluid changed to Crude Oil
1986-05-21 Well Mode changed to Abandoned
1986-05-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-31 Perforation 2547.50 2548.50 7
1980-08-13 Perforation 1779.00 1799.00 7
1980-08-13 Perforation 1804.00 1806.00 7
1980-08-14 Acid Treatment 1779.00 1806.00 0
1980-08-16 Fracture 1779.00 1806.00 0
1980-08-19 Cement Squeeze 1779.00 1806.00 0
1986-05-21 Packing Device Capped w/Cement 2380.00 2385.00 0
1986-05-21 Packing Device Capped w/Cement 1735.00 1743.00 0
1980-08-01 Acid Treatment 2547.50 2548.50 0
1980-08-02 Perforation 2566.50 2567.50 7
1980-08-02 Perforation 2569.50 2574.00 7
1980-08-02 Acid Treatment 2547.50 2574.00 0
1980-08-05 Cement Squeeze 2547.50 2574.00 0
1980-08-05 Perforation 2417.00 2419.50 7
1980-08-05 Acid Treatment 2417.00 2419.50 0
1980-08-11 Fracture 2417.00 2419.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1416 0.0 0.0 0.0
1986 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-04-26 Lost Circulation 1791.00 1791.00

For data sources see[6]

References