X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094240902000

Well Details

Well ID: 0094240902000
Loading map...
Location: 00/02-09-009-24W4/0
Location Alias: 00/02-09-09-24 W4M
Location Alias 2: 00/02-09-009-24 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 24
Section: 09
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: TORC HZ PEARCE 2-9-9-24
Operator Name: TORC Oil & Gas Ltd.
License Number: 0446346
License Date: 2012-06-07
License Status: Issued
Spud Date: 2012-09-11
Final Drill Date: 2012-10-03
Well Total Depth: 3646.00 m
Surface Hole Latitude: 49.728471
Surface Hole Longitude: -113.195764

For data sources see[1][2]

Well History

Date Event
2012-06-07 Obtained License
2012-09-13 Surface Casing Operation Performed
2012-09-17 Direction Drilling Operation Performed - Deviate
2012-09-22 Direction Drilling Operation Performed - Horizontal
2012-09-23 Lost Circulation Occurred
2012-09-24 Well Log Performed
2012-09-26 Well Log Performed
2012-09-27 Intermediate Casing Operation Performed
2012-10-03 Finished Drilling
2012-10-03 Well Log Performed
2012-10-03 Well Mode changed to Drilled and Cased
2012-10-08 Liner Casing Operation Performed
2012-10-08 Rig Released
2012-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-29 Perforation Treatment Performed - Open-Hole Completion
2012-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-02 Well Began Production
2012-11-02 Well Fluid changed to Crude Oil
2012-11-02 Well Mode changed to Flowing
2013-01-01 Well Fluid changed to Crude Oil
2013-01-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-11 Trinidad Drilling Ltd. 34E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-17 1978.50 Deviate (5 - 79 degrees)
2012-09-22 2311.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-29 Open Hole/Barefoot Completion 3634.00 3646.00 0
2012-10-30 Multi-Stage Fracture 3069.40 3069.50 0
2012-10-30 Multi-Stage Fracture 3010.50 3010.60 0
2012-10-31 Multi-Stage Fracture 2951.20 2951.30 0
2012-10-31 Multi-Stage Fracture 2891.90 2892.00 0
2012-10-31 Multi-Stage Fracture 2832.50 2832.60 0
2012-10-31 Multi-Stage Fracture 2773.20 2773.30 0
2012-10-31 Multi-Stage Fracture 2714.90 2715.00 0
2012-10-31 Multi-Stage Fracture 2642.60 2642.70 0
2012-10-31 Multi-Stage Fracture 2583.30 2583.40 0
2012-10-31 Multi-Stage Fracture 2524.40 2524.50 0
2012-10-29 Multi-Stage Fracture 3616.10 3616.20 0
2012-10-31 Multi-Stage Fracture 2465.50 2465.60 0
2012-10-29 Multi-Stage Fracture 3474.60 3474.70 0
2012-10-30 Multi-Stage Fracture 3426.70 3426.80 0
2012-10-30 Multi-Stage Fracture 3364.90 3365.00 0
2012-10-30 Multi-Stage Fracture 3305.50 3305.60 0
2012-10-30 Multi-Stage Fracture 3246.10 3246.20 0
2012-10-30 Multi-Stage Fracture 3187.30 3187.40 0
2012-10-30 Multi-Stage Fracture 3128.00 3128.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1276 0.0 0.0 0.0
2013 8524 0.0 0.0 0.0
2014 6572 0.0 0.0 0.0
2015 8252 0.0 0.0 0.0
2016 8399 0.0 0.0 0.0
2017 8619 0.0 0.0 0.0
2018 8722 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-23 Lost Circulation 1641.00 1643.00
2012-11-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References