X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094240716000

Well Details

Well ID: 0094240716000
Loading map...
Location: 00/16-07-009-24W4/0
Location Alias: 00/16-07-09-24 W4M
Location Alias 2: 00/16-07-009-24 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 24
Section: 07
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CZAR CDN-SUP ET AL PEARCE 16-7-9-24
Operator Name: Canadian Natural Resources Limited
License Number: 0080031
License Date: 1979-12-21
License Status: RecCertified
Spud Date: 1980-02-18
Final Drill Date: 1980-03-28
Well Total Depth: 2509.00 m
Surface Hole Latitude: 49.724617
Surface Hole Longitude: -113.235511

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-12-21 Obtained License
1980-02-29 Well Log Performed
1980-03-15 Drill Stem Test Performed
1980-03-20 Lost Circulation Occurred
1980-03-22 Lost Circulation Occurred
1980-03-25 Water Flow Occurred
1980-03-28 Finished Drilling
1980-03-28 Well Mode changed to Drilled and Cased
1980-03-30 Well Log Performed
1980-03-31 Production Casing Operation Performed
1980-04-23 Perforation Treatment Performed - Jet Perforation
1980-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-27 Perforation Treatment Performed - Jet Perforation
1980-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-30 Perforation Treatment Performed - Jet Perforation
1980-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-03 Perforation Treatment Performed - Fractured
1980-05-17 Well Began Production
1980-05-17 Well Fluid changed to Crude Oil
1980-05-17 Well Mode changed to Flowing
1983-07-19 Well Fluid changed to Crude Oil
1983-07-19 Well Mode changed to Suspended
1999-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-17 Plug Back Performed
1999-09-18 Perforation Treatment Performed - Cement Plug
1999-09-18 Perforation Treatment Performed - Jet Perforation
1999-09-18 Perforation Treatment Performed - Remedial Casing
1999-09-26 Well Abandoned
1999-09-26 Well Fluid changed to Crude Oil
1999-09-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-04-23 Perforation 2481.00 2487.00 7
1980-04-30 Perforation 2244.00 2247.00 14
1980-05-01 Acid Treatment 2165.00 2247.00 0
1980-05-03 Fracture 2165.00 2247.00 0
1999-09-17 Packing Device Capped w/Cement 2152.00 2160.00 0
1999-09-18 Perforation 382.00 383.00 14
1999-09-18 Remedial Casing Cementing 382.00 383.00 0
1999-09-18 Cement Plug 313.30 401.00 0
1980-04-24 Acid Treatment 2481.00 2487.00 0
1980-04-26 Packing Device Capped w/Cement 2458.50 2458.50 0
1980-04-27 Perforation 2327.50 2330.00 14
1980-04-28 Acid Treatment 2327.50 2330.00 0
1980-04-29 Packing Device Capped w/Cement 2310.00 2310.00 0
1980-04-30 Perforation 2165.00 2180.00 14
1980-04-30 Perforation 2180.00 2200.00 7
1980-04-30 Perforation 2205.00 2244.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2304 0.0 0.0 0.0
1981 1221 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-03-20 Lost Circulation 2276.00 2302.00
1980-03-22 Lost Circulation 2338.00 2341.00
1980-03-25 Water Flow 2403.00 0.00

For data sources see[6]

References