X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094191701002

Well Details

Well ID: 0094191701002
Loading map...
Location: 00/01-17-009-19W4/2
Location Alias: 00/01-17-09-19 W4M
Location Alias 2: 00/01-17-009-19 W4/02
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 19
Section: 17
County/Municipality: Lethbridge County
Well Name: SOC LEOPARD 1-17-9-19
Operator Name: AlphaBow Energy Ltd.
License Number: 0242884
License Date: 2000-10-06
License Status: Issued
Spud Date: 2001-03-07
Final Drill Date: 2001-03-11
Well Total Depth: 954.00 m
Surface Hole Latitude: 49.728544
Surface Hole Longitude: -112.534631

For data sources see[1][2]

Well History

Date Event
2000-10-06 Obtained License
2001-03-07 Direction Drilling Operation Performed - Horizontal
2001-03-07 Surface Casing Operation Performed
2001-03-11 Finished Drilling
2001-03-11 Well Log Performed
2001-03-11 Well Mode changed to Drilled and Cased
2001-03-12 Production Casing Operation Performed
2001-03-12 Rig Released
2001-03-22 Well Log Performed
2001-03-23 Perforation Treatment Performed - Jet Perforation
2001-04-20 Perforation Treatment Performed - Fractured
2001-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-04 Plug Back Performed
2001-05-05 Perforation Treatment Performed - Jet Perforation
2001-05-05 Well Log Performed
2001-05-05 Well Mode changed to Drilled and Cased
2001-05-07 Perforation Treatment Performed - Fractured
2005-11-01 Well Began Production
2005-11-01 Well Fluid changed to Gas
2005-11-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-03-07 0.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-23 Perforation 917.00 918.00 13
2001-04-20 Fracture 917.00 918.00 0
2001-05-04 Packing Device Capped w/Cement 905.00 913.00 0
2001-05-05 Perforation 862.00 864.00 13
2001-05-05 Perforation 858.50 860.00 13
2001-05-07 Fracture 862.00 864.00 0
2001-05-07 Fracture 858.50 860.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 960 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8749 0.0 0.0 0.0
2009 8659 0.0 0.0 0.0
2010 7501 0.0 0.0 0.0
2011 8209 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8757 0.0 0.0 0.0
2017 8705 0.0 0.0 0.0
2018 8214 0.0 0.0 0.0
2019 8214 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References