X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094173212002

Well Details

Well ID: 0094173212002
Loading map...
Location: 00/12-32-009-17W4/2
Location Alias: 00/12-32-09-17 W4M
Location Alias 2: 00/12-32-009-17 W4/02
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 17
Section: 32
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 12-32-9-17
Operator Name: Canadian Natural Resources Limited
License Number: 0186841
License Date: 1996-03-15
License Status: Suspension
Spud Date: 1996-04-23
Final Drill Date: 1996-04-27
Well Total Depth: 1101.00 m
Surface Hole Latitude: 49.780328
Surface Hole Longitude: -112.283624

For data sources see[1][2]

Well History

Date Event
1996-03-15 Obtained License
1996-04-24 Surface Casing Operation Performed
1996-04-25 Direction Drilling Operation Performed - Deviate
1996-04-27 Finished Drilling
1996-04-27 Well Mode changed to Drilled and Cased
1996-04-28 Production Casing Operation Performed
1996-04-28 Well Log Performed
1996-04-29 Rig Released
1996-05-01 Perforation Treatment Performed - Jet Perforation
1996-05-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-02 Perforation Treatment Performed - Jet Perforation
1996-05-02 Plug Back Performed
1996-05-28 Well Log Performed
1998-10-01 Well Began Production
1998-10-01 Well Fluid changed to Gas
1998-10-01 Well Mode changed to Flowing
1998-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-22 Plug Back Performed
1998-10-22 Well Fluid changed to Gas
1998-10-22 Well Log Performed
1998-10-22 Well Mode changed to Flowing
1998-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-23 Perforation Treatment Performed - Jet Perforation
1998-10-24 Perforation Treatment Performed - Fractured
2001-04-05 Well Fluid changed to Gas
2001-04-05 Well Mode changed to Suspended
2003-02-03 Well Fluid changed to Gas
2003-02-03 Well Mode changed to Flowing
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Suspended
2013-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-04-25 329.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-05-01 Perforation 1067.50 1069.50 13
1998-10-24 Fracture 668.00 670.00 0
2013-05-09 Packing Device Capped w/Cement 650.00 658.00 0
1996-05-02 Packing Device Capped w/Cement 1057.00 1065.00 0
1996-05-02 Perforation 1040.00 1042.00 26
1996-05-02 Perforation 1042.00 1044.00 26
1996-05-02 Perforation 1045.00 1046.00 26
1998-10-22 Packing Device Capped w/Cement 1030.00 1038.00 0
1998-10-23 Perforation 735.00 740.00 13
1998-10-23 Packing Device Capped w/Cement 725.00 733.00 0
1998-10-23 Perforation 668.00 670.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1452 0.0 0.0 0.0
1999 8659 0.0 0.0 0.0
2000 8129 0.0 0.0 0.0
2001 2142 0.0 0.0 0.0
2003 3189 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References