If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0094171403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.728134,"lon":-112.209589,"icon":""}]} |
Location: 00/03-14-009-17W4/0 | |
Location Alias: 00/03-14-09-17 W4M | |
Location Alias 2: 00/03-14-009-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 009 | |
Meridian: 4 | |
Range: 17 | |
Section: 14 | |
County/Municipality: Municipal District of Taber | |
Well Name: BLUESTONE REACH TABER 3-14-9-17 | |
Operator Name: Bluestone Resources Inc. | |
License Number: 0139819 | |
License Date: 1989-05-16 | |
License Status: RecCertified | |
Spud Date: 1989-06-12 | |
Final Drill Date: 1989-06-16 | |
Well Total Depth: 1032.00 m | |
Surface Hole Latitude: 49.728134 | |
Surface Hole Longitude: -112.209589 |
Date | Event |
---|---|
1989-05-16 | Obtained License |
1989-06-13 | Surface Casing Operation Performed |
1989-06-16 | Finished Drilling |
1989-06-16 | Well Log Performed |
1989-06-16 | Well Mode changed to Drilled and Cased |
1989-06-17 | Drill Stem Test Performed |
1989-06-18 | Production Casing Operation Performed |
1989-06-19 | Rig Released |
1989-06-25 | Well Log Performed |
1989-06-27 | Well Log Performed |
1989-06-28 | Perforation Treatment Performed - Jet Perforation |
1989-06-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-07-01 | Well Log Performed |
1989-07-02 | Perforation Treatment Performed - Jet Perforation |
1989-07-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-07-05 | Well Began Production |
1989-07-05 | Well Fluid changed to Crude Oil |
1989-07-05 | Well Mode changed to Pumping |
1991-07-20 | Well Fluid changed to Crude Oil |
1991-07-20 | Well Mode changed to Suspended |
1995-05-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-05-15 | Plug Back Performed |
1995-05-15 | Well Fluid changed to Crude Oil |
1995-05-15 | Well Mode changed to Abandoned |
1995-05-16 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-06-28 | Perforation | 991.50 | 993.50 | 13 |
1989-06-29 | Acid Treatment | 991.50 | 993.50 | 0 |
1989-07-02 | Perforation | 985.00 | 986.50 | 13 |
1989-07-03 | Acid Treatment | 985.00 | 986.50 | 0 |
1995-05-15 | Packing Device Capped w/Cement | 971.00 | 979.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 4243 | 0.0 | 0.0 | 0.0 |
1990 | 8749 | 0.0 | 0.0 | 0.0 |
1991 | 4743 | 0.0 | 0.0 | 0.0 |
For data sources see[5]