X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094170416000

Well Details

Well ID: 0094170416000
Loading map...
Location: 00/16-04-009-17W4/0
Location Alias: 00/16-04-09-17 W4M
Location Alias 2: 00/16-04-009-17 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 17
Section: 04
County/Municipality: Municipal District of Taber
Well Name: BLUESTONE TABER 16-4-9-17
Operator Name: Bluestone Resources Inc.
License Number: 0115782
License Date: 1985-07-02
License Status: Re-Entered
Spud Date: 1985-07-08
Final Drill Date: 1985-07-12
Well Total Depth: 1050.00 m
Surface Hole Latitude: 49.712910
Surface Hole Longitude: -112.241462

For data sources see[1][2]

Well History

Date Event
1985-07-02 Obtained License
1985-07-09 Surface Casing Operation Performed
1985-07-12 Finished Drilling
1985-07-12 Well Mode changed to Drilled and Cased
1985-07-13 Drill Stem Test Performed
1985-07-13 Well Log Performed
1985-07-14 Drill Stem Test Performed
1985-07-15 Production Casing Operation Performed
1985-07-15 Rig Released
1985-07-24 Well Log Performed
1985-07-25 Well Log Performed
1985-07-27 Perforation Treatment Performed - Jet Perforation
1985-07-27 Well Log Performed
1985-09-01 Well Began Production
1985-09-01 Well Fluid changed to Crude Oil
1985-09-01 Well Mode changed to Pumping
1985-09-04 Perforation Treatment Performed - Acid Wash - No Pressure
1985-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-05 Perforation Treatment Performed - Cement Squeeze
1985-12-08 Perforation Treatment Performed - Jet Perforation
1985-12-08 Well Log Performed
1985-12-09 Perforation Treatment Performed - Acid Wash - No Pressure
1985-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-11 Perforation Treatment Performed - Jet Perforation
1985-12-11 Well Log Performed
1986-02-01 Well Fluid changed to Crude Oil
1986-02-01 Well Mode changed to Suspended
1991-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-01-25 Plug Back Performed
1991-01-25 Well Abandoned
1991-01-25 Well Fluid changed to Crude Oil
1991-01-25 Well Log Performed
1991-01-25 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-27 Perforation 1002.00 1004.00 13
1985-09-04 Acid Wash 1002.00 1004.00 0
1985-12-05 Acid Treatment 1002.00 1004.00 0
1985-12-05 Cement Squeeze 1002.00 1004.00 0
1985-12-08 Perforation 1000.00 1001.00 13
1985-12-09 Acid Wash 1000.00 1001.00 0
1985-12-10 Acid Treatment 1000.00 1001.00 0
1985-12-11 Perforation 996.50 997.50 13
1991-01-25 Packing Device Capped w/Cement 981.00 989.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2039 0.0 0.0 0.0

For data sources see[5]

References