X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094163108000

Well Details

Well ID: 0094163108000
Loading map...
Location: 00/08-31-009-16W4/0
Location Alias: 00/08-31-09-16 W4M
Location Alias 2: 00/08-31-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 31
County/Municipality: Taber
Well Name: RENAISSANCE TABER 8-31-9-16
Operator Name: Husky Oil Operations Limited
License Number: 0037447
License Date: 1969-12-18
License Status: RecCertified
Spud Date: 1969-12-20
Final Drill Date: 1969-12-30
Well Total Depth: 973.80 m
Surface Hole Latitude: 49.776962
Surface Hole Longitude: -112.152545

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-12-18 Obtained License
1969-12-30 Finished Drilling
1969-12-30 Well Mode changed to Drilled and Cased
1969-12-31 Perforation Treatment Performed - Open-Hole Completion
1969-12-31 Production Casing Operation Performed
1970-02-04 Well Began Production
1970-02-04 Well Fluid changed to Crude Oil
1970-02-04 Well Mode changed to Pumping
1971-01-30 Well Fluid changed to Crude Oil
1971-01-30 Well Mode changed to Suspended
1974-03-15 Perforation Treatment Performed - Cement Squeeze
1974-03-18 Perforation Treatment Performed - Jet Perforation
1974-06-13 Well Fluid changed to Crude Oil
1974-06-13 Well Mode changed to Pumping
1998-03-18 Well Fluid changed to Crude Oil
1998-03-18 Well Mode changed to Suspended
2005-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-12 Plug Back Performed
2005-05-12 Well Fluid changed to Crude Oil
2005-05-12 Well Log Performed
2005-05-12 Well Mode changed to Abandoned Zone
2005-09-21 Well Abandoned
2005-09-21 Well Fluid changed to Crude Oil
2005-09-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-12-31 Open Hole/Barefoot Completion 960.70 973.80 0
1974-03-15 Cement Squeeze 963.20 973.80 0
1974-03-18 Perforation 956.20 957.40 13
1974-03-18 Perforation 961.00 966.50 13
2005-05-12 Packing Device Capped w/Cement 944.00 952.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 7231 0.0 0.0 0.0
1971 360 0.0 0.0 0.0
1974 1824 0.0 0.0 0.0
1975 3450 0.0 0.0 0.0
1976 1072 0.0 0.0 0.0
1977 6610 0.0 0.0 0.0
1978 4437 0.0 0.0 0.0
1979 5562 0.0 0.0 0.0
1980 6066 0.0 0.0 0.0
1981 7112 0.0 0.0 0.0
1982 3072 0.0 0.0 0.0
1983 7668 0.0 0.0 0.0
1984 8325 0.0 0.0 0.0
1985 7612 0.0 0.0 0.0
1986 8238 0.0 0.0 0.0
1987 8544 0.0 0.0 0.0
1988 8529 0.0 0.0 0.0
1989 8532 0.0 0.0 0.0
1990 7806 0.0 0.0 0.0
1991 8460 0.0 0.0 0.0
1992 8576 0.0 0.0 0.0
1993 7763 0.0 0.0 0.0
1994 8543 0.0 0.0 0.0
1995 8711 0.0 0.0 0.0
1996 8025 0.0 0.0 0.0

For data sources see[5]

References