X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094163008020

Well Details

Well ID: 0094163008020
Loading map...
Location: 02/08-30-009-16W4/0
Location Alias: 02/08-30-09-16 W4M
Location Alias 2: 02/08-30-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 30
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 8-30-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0179411
License Date: 1995-07-20
License Status: Suspension
Spud Date: 1995-11-07
Final Drill Date: 1995-11-11
Well Total Depth: 1063.00 m
Surface Hole Latitude: 49.759434
Surface Hole Longitude: -112.153386

For data sources see[1][2]

Well History

Date Event
1995-07-20 Obtained License
1995-11-08 Surface Casing Operation Performed
1995-11-09 Direction Drilling Operation Performed - Deviate
1995-11-11 Finished Drilling
1995-11-11 Well Log Performed
1995-11-11 Well Mode changed to Drilled and Cased
1995-11-12 Production Casing Operation Performed
1995-11-12 Rig Released
1995-11-20 Perforation Treatment Performed - Jet Perforation
1995-11-20 Well Log Performed
1995-11-21 Perforation Treatment Performed - Jet Perforation
1995-11-25 Perforation Treatment Performed - Fractured
1995-12-01 Well Log Performed
1995-12-20 Well Began Injection
1995-12-20 Well Fluid changed to Water
1995-12-20 Well Type changed to Injection
1996-01-11 Well Log Performed
2006-11-14 Well Log Performed
2006-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-11-18 Perforation Treatment Performed - Cement Squeeze
2006-11-18 Plug Back Performed
2006-11-18 Well Fluid changed to Water
2006-11-18 Well Mode changed to Abandoned Zone
2006-11-18 Well Type changed to Injection
2006-11-22 Perforation Treatment Performed - Jet Perforation
2006-11-22 Well Log Performed
2006-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-04 Well Log Performed
2011-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-11-09 252.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-20 Perforation 1028.50 1033.00 13
1995-11-21 Perforation 1022.00 1026.00 13
1995-11-25 Fracture 1022.00 1033.00 0
2006-11-16 Acid Treatment 1022.00 1033.00 0
2006-11-18 Cement Squeeze 1022.00 1026.00 0
2006-11-18 Cement Squeeze 1028.50 1033.00 0
2006-11-22 Perforation 1044.50 1047.50 20
2006-12-02 Acid Treatment 1044.50 1047.50 0
2011-03-01 Packing Device Capped w/Cement 1030.00 1038.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[6]

References