X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094162914000

Well Details

Well ID: 0094162914000
Loading map...
Location: 00/14-29-009-16W4/0
Location Alias: 00/14-29-09-16 W4M
Location Alias 2: 00/14-29-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 29
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 14-29-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0035914
License Date: 1969-02-28
License Status: Abandoned
Spud Date: 1969-03-03
Final Drill Date: 1969-03-08
Well Total Depth: 971.40 m
Surface Hole Latitude: 49.769552
Surface Hole Longitude: -112.141954

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-02-28 Obtained License
1969-03-08 Drill Stem Test Performed
1969-03-08 Finished Drilling
1969-03-08 Well Mode changed to Drilled and Cased
1969-03-09 Production Casing Operation Performed
1969-03-10 Perforation Treatment Performed - Open-Hole Completion
1969-04-18 Well Began Production
1969-04-18 Well Fluid changed to Crude Oil
1969-04-18 Well Mode changed to Pumping
1993-08-01 Well Fluid changed to Crude Oil
1993-08-01 Well Mode changed to Suspended
1996-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-03 Perforation Treatment Performed - Jet Perforation
1996-10-03 Plug Back Performed
1996-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-04 Perforation Treatment Performed - Jet Perforation
1996-10-04 Perforation Treatment Performed - Remedial Casing
1997-08-25 Well Abandoned
1997-08-25 Well Fluid changed to Crude Oil
1997-08-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-03-10 Open Hole/Barefoot Completion 964.40 971.40 0
1996-10-03 Packing Device Capped w/Cement 952.00 960.00 0
1996-10-03 Perforation 184.00 185.00 13
1996-10-03 Acid Treatment 184.00 185.00 0
1996-10-03 Packing Device Capped w/Cement 173.00 189.00 0
1996-10-04 Perforation 103.00 103.30 36
1996-10-04 Acid Treatment 103.00 103.30 0
1996-10-04 Remedial Casing Cementing 103.00 103.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 5282 0.0 0.0 0.0
1970 8156 0.0 0.0 0.0
1971 8024 0.0 0.0 0.0
1972 6583 0.0 0.0 0.0
1973 8511 0.0 0.0 0.0
1974 5403 0.0 0.0 0.0
1975 6107 0.0 0.0 0.0
1976 7729 0.0 0.0 0.0
1977 7141 0.0 0.0 0.0
1978 7253 0.0 0.0 0.0
1979 8711 0.0 0.0 0.0
1980 8066 0.0 0.0 0.0
1981 8659 0.0 0.0 0.0
1982 5720 0.0 0.0 0.0
1983 8483 0.0 0.0 0.0
1984 8078 0.0 0.0 0.0
1985 7996 0.0 0.0 0.0
1986 984 0.0 0.0 0.0

For data sources see[5]

References