X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094162904030

Well Details

Well ID: 0094162904030
Loading map...
Location: 03/04-29-009-16W4/0
Location Alias: 03/04-29-09-16 W4M
Location Alias 2: 03/04-29-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 29
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 4-29-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0177052
License Date: 1995-03-22
License Status: Abandoned
Spud Date: 1995-11-02
Final Drill Date: 1995-11-06
Well Total Depth: 1027.00 m
Surface Hole Latitude: 49.759473
Surface Hole Longitude: -112.145670

For data sources see[1][2]

Well History

Date Event
1995-03-22 Obtained License
1995-11-03 Surface Casing Operation Performed
1995-11-04 Direction Drilling Operation Performed - Deviate
1995-11-06 Finished Drilling
1995-11-06 Well Log Performed
1995-11-06 Well Mode changed to Drilled and Cased
1995-11-07 Production Casing Operation Performed
1995-11-07 Rig Released
1995-11-09 Perforation Treatment Performed - Jet Perforation
1995-11-10 Perforation Treatment Performed - Fractured
1995-11-10 Well Began Production
1995-11-10 Well Fluid changed to Crude Oil
1995-11-10 Well Mode changed to Pumping
1995-12-07 Well Log Performed
1998-10-30 Well Fluid changed to Crude Oil
1998-10-30 Well Mode changed to Suspended
1999-10-16 Well Log Performed
1999-11-18 Well Began Injection
1999-11-18 Well Fluid changed to Water
1999-11-18 Well Type changed to Injection
2000-04-27 Perforation Treatment Performed - Fractured
2000-04-27 Perforation Treatment Performed - Jet Perforation
2017-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-07-31 Well Fluid changed to Water
2018-07-31 Well Mode changed to Suspended
2018-07-31 Well Type changed to Injection
2019-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-08 Plug Back Performed
2019-12-08 Well Fluid changed to Water
2019-12-08 Well Log Performed
2019-12-08 Well Mode changed to Abandoned Zone
2019-12-08 Well Type changed to Injection
2020-01-13 Well Abandoned
2020-01-13 Well Fluid changed to Water
2020-01-13 Well Mode changed to Abandoned
2020-01-13 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-11-04 348.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-09 Perforation 987.50 991.00 13
1995-11-10 Fracture 987.50 991.00 0
2000-04-27 Perforation 987.50 991.00 13
2000-04-27 Fracture 987.50 991.00 0
2017-02-24 Acid Treatment 987.50 991.00 0
2019-12-08 Packing Device Capped w/Cement 968.00 977.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1152 0.0 0.0 0.0
1996 8769 0.0 0.0 0.0
1997 8751 0.0 0.0 0.0
1998 3887 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-24 No Incident Encountered 0.00 0.00
2019-12-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References