X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094162014030

Well Details

Well ID: 0094162014030
Loading map...
Location: 03/14-20-009-16W4/0
Location Alias: 03/14-20-09-16 W4M
Location Alias 2: 03/14-20-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 20
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 14-20-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0176585
License Date: 1995-03-02
License Status: Issued
Spud Date: 1995-03-14
Final Drill Date: 1995-03-18
Well Total Depth: 1061.00 m
Surface Hole Latitude: 49.756267
Surface Hole Longitude: -112.140282

For data sources see[1][2]

Well History

Date Event
1995-03-02 Obtained License
1995-03-15 Direction Drilling Operation Performed - Deviate
1995-03-15 Surface Casing Operation Performed
1995-03-18 Finished Drilling
1995-03-18 Well Log Performed
1995-03-18 Well Mode changed to Drilled and Cased
1995-03-19 Production Casing Operation Performed
1995-03-19 Rig Released
1995-03-21 Perforation Treatment Performed - Jet Perforation
1995-03-23 Well Began Production
1995-03-23 Well Fluid changed to Crude Oil
1995-03-23 Well Mode changed to Pumping
1995-06-19 Well Log Performed
1997-03-05 Perforation Treatment Performed - Jet Perforation
1997-03-06 Perforation Treatment Performed - Fractured
1997-03-06 Well Log Performed
1997-03-08 Well Log Performed
1997-03-30 Well Fluid changed to Crude Oil
1997-03-30 Well Mode changed to Suspended
1997-05-01 Well Began Injection
1997-05-01 Well Fluid changed to Water
1997-05-01 Well Type changed to Injection
2005-07-02 Well Log Performed
2005-07-03 Well Log Performed
2005-07-04 Perforation Treatment Performed - Jet Perforation
2005-07-04 Well Log Performed
2005-07-05 Perforation Treatment Performed - Remedial Casing
2005-07-08 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-03-15 197.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-21 Perforation 1021.00 1022.00 13
1995-03-21 Perforation 1023.00 1024.50 13
1997-03-05 Perforation 1024.50 1027.00 13
1997-03-06 Fracture 1021.00 1027.00 0
2005-07-04 Perforation 270.00 271.00 13
2005-07-05 Remedial Casing Cementing 270.00 271.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 6760 0.0 0.0 0.0
1996 8570 0.0 0.0 0.0
1997 1464 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References