X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094161807020

Well Details

Well ID: 0094161807020
Loading map...
Location: 02/07-18-009-16W4/0
Location Alias: 02/07-18-09-16 W4M
Location Alias 2: 02/07-18-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 18
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 7-18-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0052245
License Date: 1974-12-17
License Status: Suspension
Spud Date: 1974-12-18
Final Drill Date: 1974-12-22
Well Total Depth: 969.30 m
Surface Hole Latitude: 49.733403
Surface Hole Longitude: -112.160476

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-12-17 Obtained License
1974-12-22 Finished Drilling
1974-12-22 Well Mode changed to Drilled and Cased
1974-12-23 Production Casing Operation Performed
1975-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-09 Perforation Treatment Performed - Jet Perforation
1975-01-16 Well Began Production
1975-01-16 Well Fluid changed to Crude Oil
1975-01-16 Well Mode changed to Pumping
2005-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-11 Plug Back Performed
2005-02-11 Well Fluid changed to Crude Oil
2005-02-11 Well Log Performed
2005-02-11 Well Mode changed to Abandoned Zone
2005-05-05 Perforation Treatment Performed - Jet Perforation
2005-05-05 Well Log Performed
2007-05-18 Perforation Treatment Performed - Cement Squeeze
2007-05-18 Plug Back Performed
2007-05-31 Perforation Treatment Performed - Jet Perforation
2007-06-01 Perforation Treatment Performed - Jet Perforation
2007-06-01 Well Log Performed
2007-06-05 Well Fluid changed to Crude Oil
2007-06-05 Well Mode changed to Pumping
2013-05-28 Well Fluid changed to Crude Oil
2013-05-28 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-01-09 Perforation 949.80 951.00 7
1975-01-09 Perforation 957.40 961.90 7
1975-01-09 Acid Treatment 949.80 961.90 0
2005-02-11 Packing Device Capped w/Cement 938.00 946.00 0
2005-05-05 Perforation 670.00 671.20 20
2007-05-18 Cement Squeeze 670.00 671.20 0
2007-05-31 Perforation 957.40 961.90 7
2007-05-31 Perforation 949.80 951.00 7
2007-06-01 Perforation 957.00 963.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 2864 0.0 0.0 0.0
1976 2424 0.0 0.0 0.0
1977 7656 0.0 0.0 0.0
1978 8529 0.0 0.0 0.0
1979 8319 0.0 0.0 0.0
1980 5992 0.0 0.0 0.0
1981 8555 0.0 0.0 0.0
1982 6960 0.0 0.0 0.0
1983 8376 0.0 0.0 0.0
1984 7848 0.0 0.0 0.0
1985 7976 0.0 0.0 0.0
1986 8276 0.0 0.0 0.0
1987 8526 0.0 0.0 0.0
1988 8616 0.0 0.0 0.0
1989 8697 0.0 0.0 0.0
1990 8612 0.0 0.0 0.0
1991 8561 0.0 0.0 0.0
1992 8780 0.0 0.0 0.0
1993 8146 0.0 0.0 0.0
1994 8737 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8702 0.0 0.0 0.0
1997 8751 0.0 0.0 0.0
1998 8716 0.0 0.0 0.0
1999 8729 0.0 0.0 0.0
2000 4023 0.0 0.0 0.0
2007 3936 0.0 0.0 0.0
2008 8755 0.0 0.0 0.0
2009 8642 0.0 0.0 0.0
2010 7910 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 1026 0.0 0.0 0.0

For data sources see[5]

References