X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094161713000

Well Details

Well ID: 0094161713000
Loading map...
Location: 00/13-17-009-16W4/0
Location Alias: 00/13-17-09-16 W4M
Location Alias 2: 00/13-17-009-16 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 16
Section: 17
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 13-17-9-16
Operator Name: Canadian Natural Resources Limited
License Number: 0026461
License Date: 1964-07-16
License Status: Abandoned
Spud Date: 1964-07-22
Final Drill Date: 1964-07-26
Well Total Depth: 975.40 m
Surface Hole Latitude: 49.741158
Surface Hole Longitude: -112.147797

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-07-16 Obtained License
1964-07-26 Finished Drilling
1964-07-26 Well Mode changed to Drilled and Cased
1964-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-27 Perforation Treatment Performed - Jet Perforation
1964-07-27 Production Casing Operation Performed
1964-09-05 Perforation Treatment Performed - Fractured
1964-10-17 Well Began Production
1964-10-17 Well Fluid changed to Crude Oil
1964-10-17 Well Mode changed to Pumping
1988-04-17 Well Log Performed
1988-05-01 Perforation Treatment Performed - Acid Wash - No Pressure
1988-05-01 Perforation Treatment Performed - Jet Perforation
1988-05-02 Perforation Treatment Performed - Cement Squeeze
1988-05-02 Plug Back Performed
1988-05-02 Well Fluid changed to Crude Oil
1988-05-02 Well Mode changed to Abandoned
1988-05-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-07-27 Perforation 968.30 969.90 13
1964-07-27 Acid Treatment 968.30 969.90 0
1964-09-05 Fracture 968.30 969.90 0
1988-05-01 Perforation 229.00 229.70 10
1988-05-01 Acid Wash 229.00 229.70 0
1988-05-02 Cement Squeeze 229.00 229.70 0
1988-05-02 Cement Squeeze 968.30 969.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1320 0.0 0.0 0.0
1969 7650 0.0 0.0 0.0
1970 8579 0.0 0.0 0.0
1971 5889 0.0 0.0 0.0
1972 6007 0.0 0.0 0.0
1973 7516 0.0 0.0 0.0
1974 5283 0.0 0.0 0.0
1975 4293 0.0 0.0 0.0
1976 647 0.0 0.0 0.0
1977 24 0.0 0.0 0.0

For data sources see[5]

References