X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094152707002

Well Details

Well ID: 0094152707002
Loading map...
Location: 00/07-27-009-15W4/2
Location Alias: 00/07-27-09-15 W4M
Location Alias 2: 00/07-27-009-15 W4/02
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 15
Section: 27
County/Municipality: Municipal District of Taber
Well Name: SLE TABER 7-27-9-15
Operator Name: SanLing Energy Ltd.
License Number: 0163140
License Date: 1993-12-13
License Status: Issued
Spud Date: 1993-12-28
Final Drill Date: 1994-01-09
Well Total Depth: 1045.00 m
Surface Hole Latitude: 49.763771
Surface Hole Longitude: -111.956037

For data sources see[1][2]

Well History

Date Event
1993-12-13 Obtained License
1993-12-29 Surface Casing Operation Performed
1993-12-30 Water Flow Occurred
1993-12-31 Direction Drilling Operation Performed - Deviate
1994-01-03 Well Log Performed
1994-01-04 Well Log Performed
1994-01-07 Production Casing Operation Performed
1994-01-09 Finished Drilling
1994-01-09 Perforation Treatment Performed - Cement Plug
1994-01-09 Perforation Treatment Performed - Open-Hole Completion
1994-01-09 Well Log Performed
1994-01-09 Well Mode changed to Drilled and Cased
1994-01-10 Rig Released
1994-02-22 Well Log Performed
1998-09-05 Well Log Performed
1998-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-07 Perforation Treatment Performed - Jet Perforation
2001-11-20 Perforation Treatment Performed - Jet Perforation
2001-11-20 Well Mode changed to Drilled and Cased
2001-11-28 Well Began Production
2001-11-28 Well Fluid changed to Gas
2001-11-28 Well Mode changed to Flowing
2012-12-01 Well Fluid changed to Gas
2012-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-12-31 280.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-01-09 Open Hole/Barefoot Completion 1010.00 1045.00 0
1994-01-09 Cement Plug 974.00 1045.00 0
1998-09-07 Packing Device Capped w/Cement 894.00 902.00 0
1998-09-07 Perforation 679.00 681.00 14
2001-11-20 Perforation 683.30 684.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 950 0.0 0.0 0.0
2002 8601 0.0 0.0 0.0
2003 8704 0.0 0.0 0.0
2004 8774 0.0 0.0 0.0
2005 8609 0.0 0.0 0.0
2006 7529 0.0 0.0 0.0
2007 6332 0.0 0.0 0.0
2008 24 0.0 0.0 0.0
2009 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-12-30 Water Flow 280.00 280.00

For data sources see[7]

References