X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094152707000

Well Details

Well ID: 0094152707000
Loading map...
Location: 00/07-27-009-15W4/0
Location Alias: 00/07-27-09-15 W4M
Location Alias 2: 00/07-27-009-15 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 15
Section: 27
County/Municipality: Municipal District of Taber
Well Name: SLE TABER 7-27-9-15
Operator Name: SanLing Energy Ltd.
License Number: 0163140
License Date: 1993-12-13
License Status: Issued
Spud Date: 1993-12-28
Final Drill Date: 1994-01-09
Well Total Depth: 1045.00 m
Surface Hole Latitude: 49.763771
Surface Hole Longitude: -111.956037

For data sources see[1][2]

Well History

Date Event
1993-12-13 Obtained License
1993-12-29 Surface Casing Operation Performed
1993-12-30 Water Flow Occurred
1993-12-31 Direction Drilling Operation Performed - Deviate
1994-01-03 Well Log Performed
1994-01-04 Well Log Performed
1994-01-07 Production Casing Operation Performed
1994-01-09 Finished Drilling
1994-01-09 Perforation Treatment Performed - Cement Plug
1994-01-09 Perforation Treatment Performed - Open-Hole Completion
1994-01-09 Well Log Performed
1994-01-10 Rig Released
1994-01-10 Well Mode changed to Drilled and Cased
1994-02-22 Well Log Performed
1998-09-05 Well Log Performed
1998-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-07 Perforation Treatment Performed - Jet Perforation
1999-04-01 Well Began Production
1999-04-01 Well Fluid changed to Gas
1999-04-01 Well Mode changed to Flowing
2001-11-20 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-12-31 280.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-01-09 Open Hole/Barefoot Completion 1010.00 1045.00 0
1994-01-09 Cement Plug 974.00 1045.00 0
1998-09-07 Packing Device Capped w/Cement 894.00 902.00 0
1998-09-07 Perforation 679.00 681.00 14
2001-11-20 Perforation 683.30 684.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 6529 0.0 0.0 0.0
2000 8664 0.0 0.0 0.0
2001 7017 0.0 0.0 0.0
2003 5019 0.0 0.0 0.0
2004 8773 0.0 0.0 0.0
2005 8582 0.0 0.0 0.0
2006 5980 0.0 0.0 0.0
2009 4416 0.0 0.0 0.0
2010 8749 0.0 0.0 0.0
2011 8734 0.0 0.0 0.0
2012 8773 0.0 0.0 0.0
2013 8741 0.0 0.0 0.0
2014 8697 0.0 0.0 0.0
2015 8736 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8095 0.0 0.0 0.0
2018 8587 0.0 0.0 0.0
2019 8656 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-12-30 Water Flow 280.00 280.00

For data sources see[7]

References