X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0094131806000

Well Details

Well ID: 0094131806000
Loading map...
Location: 00/06-18-009-13W4/0
Location Alias: 00/06-18-09-13 W4M
Location Alias 2: 00/06-18-009-13 W4/00
Country: Canada
Province: Alberta
Township: 009
Meridian: 4
Range: 13
Section: 18
County/Municipality: Municipal District of Taber
Well Name: CORINTHIAN TABER 6-18-9-13
Operator Name: Surge Energy Inc.
License Number: 0251821
License Date: 2001-02-23
License Status: RecCertified
Spud Date: 2001-02-25
Final Drill Date: 2001-02-27
Well Total Depth: 780.00 m
Surface Hole Latitude: 49.731474
Surface Hole Longitude: -111.755128

For data sources see[1][2]

Well History

Date Event
2001-02-23 Obtained License
2001-02-25 Surface Casing Operation Performed
2001-02-27 Finished Drilling
2001-02-27 Well Log Performed
2001-02-28 Production Casing Operation Performed
2001-02-28 Rig Released
2001-02-28 Well Mode changed to Drilled and Cased
2001-03-01 Perforation Treatment Performed - Jet Perforation
2001-03-05 Perforation Treatment Performed - Fractured
2003-05-23 Well Began Production
2003-05-23 Well Fluid changed to Gas
2003-05-23 Well Mode changed to Flowing
2018-10-31 Well Fluid changed to Gas
2018-10-31 Well Mode changed to Suspended
2019-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-23 Plug Back Performed
2019-02-23 Well Fluid changed to Gas
2019-02-23 Well Mode changed to Abandoned Zone
2019-03-14 Well Abandoned
2019-03-14 Well Fluid changed to Gas
2019-03-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-01 Perforation 576.00 578.00 7
2001-03-01 Perforation 571.00 573.00 7
2001-03-01 Perforation 568.00 569.00 7
2001-03-05 Fracture 568.00 578.00 0
2019-02-23 Packing Device Capped w/Cement 550.00 558.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 5095 0.0 0.0 0.0
2004 8693 0.0 0.0 0.0
2005 5836 0.0 0.0 0.0
2006 6929 0.0 0.0 0.0
2007 7948 0.0 0.0 0.0
2008 8015 0.0 0.0 0.0
2009 7954 0.0 0.0 0.0
2010 8212 0.0 0.0 0.0
2011 8649 0.0 0.0 0.0
2012 8699 0.0 0.0 0.0
2013 8436 0.0 0.0 0.0
2014 8536 0.0 0.0 0.0
2015 8406 0.0 0.0 0.0
2016 4680 0.0 0.0 0.0
2017 8483 0.0 0.0 0.0
2018 5006 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References