X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084232713020

Well Details

Well ID: 0084232713020
Loading map...
Location: 02/13-27-008-23W4/0
Location Alias: 02/13-27-08-23 W4M
Location Alias 2: 02/13-27-008-23 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 23
Section: 27
County/Municipality: Blood 148
Well Name: TAC 102 HZ PENNY 13-27-8-23
Operator Name: Tamarack Acquisition Corp.
License Number: 0485310
License Date: 2017-09-07
License Status: Amended
Spud Date: 2018-06-09
Final Drill Date: 2018-06-24
Well Total Depth: 3199.00 m
Surface Hole Latitude: 49.673413
Surface Hole Longitude: -113.021676

For data sources see[1][2]

Well History

Date Event
2017-09-07 Obtained License
2018-06-09 Surface Casing Operation Performed
2018-06-10 Direction Drilling Operation Performed - Deviate
2018-06-10 Well Log Performed
2018-06-12 Direction Drilling Operation Performed - Horizontal
2018-06-12 Well Log Performed
2018-06-13 Intermediate Casing Operation Performed
2018-06-24 Finished Drilling
2018-06-24 Well Log Performed
2018-06-24 Well Mode changed to Drilled and Cased
2018-06-26 Well Log Performed
2018-06-27 Liner Casing Operation Performed
2018-06-29 Rig Released
2018-07-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-20 Well Began Production
2018-07-20 Well Fluid changed to Crude Oil
2018-07-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-06-10 902.80 Deviate (5 - 79 degrees)
2018-06-12 1444.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-09 Multi-Stage Fracture 3149.80 3149.90 0
2018-07-10 Multi-Stage Fracture 2688.00 2688.10 0
2018-07-10 Multi-Stage Fracture 2649.90 2650.00 0
2018-07-10 Multi-Stage Fracture 2611.30 2611.40 0
2018-07-10 Multi-Stage Fracture 2572.70 2572.80 0
2018-07-10 Multi-Stage Fracture 2521.50 2521.60 0
2018-07-10 Multi-Stage Fracture 2470.60 2470.70 0
2018-07-10 Multi-Stage Fracture 2419.40 2419.50 0
2018-07-10 Multi-Stage Fracture 2368.20 2368.30 0
2018-07-10 Multi-Stage Fracture 2316.90 2317.00 0
2018-07-10 Multi-Stage Fracture 2265.70 2265.80 0
2018-07-09 Multi-Stage Fracture 3098.60 3098.70 0
2018-07-10 Multi-Stage Fracture 2214.50 2214.60 0
2018-07-11 Multi-Stage Fracture 2163.30 2163.40 0
2018-07-11 Multi-Stage Fracture 2112.00 2112.10 0
2018-07-11 Multi-Stage Fracture 2060.80 2060.90 0
2018-07-11 Multi-Stage Fracture 2009.50 2009.60 0
2018-07-11 Multi-Stage Fracture 1958.30 1958.40 0
2018-07-11 Multi-Stage Fracture 1919.70 1919.80 0
2018-07-11 Multi-Stage Fracture 1881.10 1881.20 0
2018-07-11 Multi-Stage Fracture 1803.90 1804.00 0
2018-07-11 Multi-Stage Fracture 1752.70 1752.80 0
2018-07-09 Multi-Stage Fracture 3047.40 3047.50 0
2018-07-11 Multi-Stage Fracture 1701.60 1701.70 0
2018-07-11 Multi-Stage Fracture 1650.40 1650.50 0
2018-07-11 Multi-Stage Fracture 1599.20 1599.30 0
2018-07-11 Multi-Stage Fracture 1560.60 1560.70 0
2018-07-11 Multi-Stage Fracture 1483.40 1483.50 0
2018-07-09 Multi-Stage Fracture 2996.20 2996.30 0
2018-07-09 Multi-Stage Fracture 2919.40 2919.50 0
2018-07-09 Multi-Stage Fracture 2880.80 2880.90 0
2018-07-09 Multi-Stage Fracture 2842.40 2842.50 0
2018-07-09 Multi-Stage Fracture 2803.80 2803.90 0
2018-07-09 Multi-Stage Fracture 2765.20 2765.30 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-09 2018-07-11 1,322 2,586 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 89.8773 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 9.2914 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.1506 N/A
water 7732-18-5 100 0.1506 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0386 N/A
IH-CS-4 Fusion Technologies Inc. Clay Control Non-Whimis Regulated Not Available 100 0.0849 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1368 N/A
Ethylene glycol 107-21-1 100 0.1368 N/A
Potassium Carbonate 584-08-7 100 0.1368 N/A
Potassium Hydroxide 1310-58-3 100 0.1368 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.008 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3431 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0688 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0688 N/A
water 7732-18-5 100 0.0688 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3912 0.0 0.0 0.0
2019 8458 0.0 0.0 0.0
2020 2137 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-06-29 No Incident Encountered 0.00 0.00
2018-07-11 No Incident Encountered 0.00 0.00

For data sources see[8]

References