X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084220201000

Well Details

Well ID: 0084220201000
Loading map...
Location: 00/01-02-008-22W4/0
Location Alias: 00/01-02-08-22 W4M
Location Alias 2: 00/01-02-008-22 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 22
Section: 02
County/Municipality: Lethbridge
Well Name: TAC 7-10 HZ PENNY 1-2-8-22
Operator Name: Tamarack Acquisition Corp.
License Number: 0492158
License Date: 2018-11-21
License Status: Issued
Spud Date: 2019-01-19
Final Drill Date: 2019-02-03
Well Total Depth: 3763.00 m
Surface Hole Latitude: 49.629650
Surface Hole Longitude: -112.898622

For data sources see[1][2]

Well History

Date Event
2018-11-21 Obtained License
2019-01-19 Lost Circulation Occurred
2019-01-22 Surface Casing Operation Performed
2019-01-23 Direction Drilling Operation Performed - Deviate
2019-01-24 Direction Drilling Operation Performed - Horizontal
2019-01-25 Intermediate Casing Operation Performed
2019-01-25 Well Log Performed
2019-02-03 Finished Drilling
2019-02-03 Well Log Performed
2019-02-03 Well Mode changed to Drilled and Cased
2019-02-06 Liner Casing Operation Performed
2019-02-07 Rig Released
2019-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Well Began Production
2019-03-08 Well Fluid changed to Crude Oil
2019-03-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-19 Bonanza Drilling Inc. 10 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-23 773.60 Deviate (5 - 79 degrees)
2019-01-24 1117.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-13 Multi-Stage Fracture 3705.80 3705.90 0
2019-02-13 Multi-Stage Fracture 3236.30 3236.40 0
2019-02-13 Multi-Stage Fracture 3184.20 3184.30 0
2019-02-13 Multi-Stage Fracture 3132.00 3132.10 0
2019-02-13 Multi-Stage Fracture 3080.30 3080.40 0
2019-02-13 Multi-Stage Fracture 3028.10 3028.20 0
2019-02-13 Multi-Stage Fracture 2975.90 2976.00 0
2019-02-13 Multi-Stage Fracture 2923.80 2923.90 0
2019-02-13 Multi-Stage Fracture 2871.60 2871.70 0
2019-02-13 Multi-Stage Fracture 2610.90 2611.00 0
2019-02-13 Multi-Stage Fracture 2559.20 2559.30 0
2019-02-13 Multi-Stage Fracture 3653.70 3653.80 0
2019-02-13 Multi-Stage Fracture 2507.10 2507.20 0
2019-02-13 Multi-Stage Fracture 2442.30 2442.40 0
2019-02-13 Multi-Stage Fracture 2377.50 2377.60 0
2019-02-13 Multi-Stage Fracture 2312.70 2312.80 0
2019-02-13 Multi-Stage Fracture 2053.30 2053.40 0
2019-02-13 Multi-Stage Fracture 1988.50 1988.60 0
2019-02-14 Multi-Stage Fracture 1923.70 1923.80 0
2019-02-14 Multi-Stage Fracture 1858.90 1859.00 0
2019-02-14 Multi-Stage Fracture 1794.20 1794.30 0
2019-02-14 Multi-Stage Fracture 1729.30 1729.40 0
2019-02-13 Multi-Stage Fracture 3601.50 3601.60 0
2019-02-14 Multi-Stage Fracture 1664.50 1664.60 0
2019-02-14 Multi-Stage Fracture 1599.70 1599.80 0
2019-02-14 Multi-Stage Fracture 1534.80 1534.90 0
2019-02-14 Multi-Stage Fracture 1470.00 1470.10 0
2019-02-14 Multi-Stage Fracture 1405.10 1405.20 0
2019-02-14 Multi-Stage Fracture 1340.30 1340.40 0
2019-02-14 Multi-Stage Fracture 1275.40 1275.50 0
2019-02-13 Multi-Stage Fracture 3549.30 3549.40 0
2019-02-13 Multi-Stage Fracture 3497.10 3497.20 0
2019-02-13 Multi-Stage Fracture 3445.00 3445.10 0
2019-02-13 Multi-Stage Fracture 3392.80 3392.90 0
2019-02-13 Multi-Stage Fracture 3340.70 3340.80 0
2019-02-13 Multi-Stage Fracture 3288.50 3288.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-13 2019-02-14 1,018 2,676 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 87.6626 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 5.7996 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0523 N/A
water 7732-18-5 100 0.0523 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.052 N/A
IH-CS-4 Fusion Technologies Inc. Clay Control Non-Whimis Regulated Not Available 100 0.1219 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1297 N/A
Ethylene glycol 107-21-1 100 0.1297 N/A
Potassium Carbonate 584-08-7 100 0.1297 N/A
Potassium Hydroxide 1310-58-3 100 0.1297 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0026 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3137 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0655 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0655 N/A
water 7732-18-5 100 0.0655 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-12 2019-02-14 Surface Water - River 2754
2019-02-10 2019-02-11 Municipal Water 132

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7120 0.0 0.0 0.0
2020 2097 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-19 Lost Circulation 35.00 361.50
2019-02-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References