X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084172409000

Well Details

Well ID: 0084172409000
Loading map...
Location: 00/09-24-008-17W4/0
Location Alias: 00/09-24-08-17 W4M
Location Alias 2: 00/09-24-008-17 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 17
Section: 24
County/Municipality: Municipal District of Taber
Well Name: CNRL HORSEFLY 9-24-8-17
Operator Name: Canadian Natural Resources Limited
License Number: 0195950
License Date: 1996-12-23
License Status: Suspension
Spud Date: 1997-01-25
Final Drill Date: 1997-01-28
Well Total Depth: 1024.00 m
Surface Hole Latitude: 49.664693
Surface Hole Longitude: -112.174924

For data sources see[1][2]

Well History

Date Event
1996-12-23 Obtained License
1997-01-26 Surface Casing Operation Performed
1997-01-28 Finished Drilling
1997-01-28 Well Log Performed
1997-01-29 Production Casing Operation Performed
1997-01-29 Rig Released
1997-01-29 Well Mode changed to Drilled and Cased
1997-02-02 Perforation Treatment Performed - Jet Perforation
1999-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-28 Perforation Treatment Performed - Jet Perforation
1999-09-28 Plug Back Performed
1999-09-28 Well Mode changed to Abandoned Zone
1999-10-09 Perforation Treatment Performed - Fractured
2012-03-08 Perforation Treatment Performed - Cement Squeeze
2012-03-08 Plug Back Performed
2012-03-14 Perforation Treatment Performed - Jet Perforation
2012-04-03 Well Began Production
2012-04-03 Well Fluid changed to Crude Oil
2012-04-03 Well Mode changed to Pumping
2016-09-30 Well Fluid changed to Crude Oil
2016-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-02 Perforation 1003.00 1004.00 13
1997-02-02 Perforation 978.50 980.50 13
1999-09-28 Packing Device Capped w/Cement 994.00 1002.00 0
1999-09-28 Packing Device Capped w/Cement 963.00 971.00 0
1999-09-28 Perforation 607.00 608.50 13
1999-10-09 Fracture 607.00 608.50 0
2012-03-08 Cement Squeeze 607.00 608.50 0
2012-03-14 Perforation 978.50 980.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6477 0.0 0.0 0.0
2013 8698 0.0 0.0 0.0
2014 8724 0.0 0.0 0.0
2015 5201 0.0 0.0 0.0

For data sources see[5]

References