X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084163305000

Well Details

Well ID: 0084163305000
Loading map...
Location: 00/05-33-008-16W4/0
Location Alias: 00/05-33-08-16 W4M
Location Alias 2: 00/05-33-008-16 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 16
Section: 33
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 5-33-8-16
Operator Name: Canadian Natural Resources Limited
License Number: 0031854
License Date: 1967-02-24
License Status: Suspension
Spud Date: 1967-02-25
Final Drill Date: 1967-03-03
Well Total Depth: 971.70 m
Surface Hole Latitude: 49.689452
Surface Hole Longitude: -112.124111

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-02-24 Obtained License
1967-03-03 Drill Stem Test Performed
1967-03-03 Finished Drilling
1967-03-03 Well Mode changed to Drilled and Cased
1967-03-04 Production Casing Operation Performed
1967-03-11 Perforation Treatment Performed - Bullet Perforation
1967-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-03-13 Well Began Production
1967-03-13 Well Fluid changed to Crude Oil
1967-03-13 Well Mode changed to Pumping
1968-11-04 Perforation Treatment Performed - Jet Perforation
1968-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-11-05 Perforation Treatment Performed - Acid Wash - No Pressure
1968-11-27 Well Began Injection
1968-11-27 Well Fluid changed to Water
1968-11-27 Well Type changed to Injection
1973-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-31 Well Fluid changed to Water
1993-07-31 Well Mode changed to Suspended
1993-07-31 Well Type changed to Injection
1993-12-01 Well Fluid changed to Water
1993-12-01 Well Type changed to Disposal
1998-05-30 Well Fluid changed to Water
1998-05-30 Well Type changed to Disposal
1998-05-31 Well Fluid changed to Water
1998-05-31 Well Mode changed to Suspended
1998-05-31 Well Type changed to Disposal
2002-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-18 Plug Back Performed
2002-12-18 Well Fluid changed to Water
2002-12-18 Well Log Performed
2002-12-18 Well Mode changed to Abandoned Zone
2002-12-18 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-03-11 Bullet Perforation 953.40 954.90 13
1967-03-12 Acid Treatment 953.40 954.90 0
1968-11-04 Perforation 957.40 959.20 13
1968-11-04 Perforation 960.40 963.50 13
1968-11-05 Acid Wash 953.40 963.50 0
1968-11-05 Acid Treatment 953.40 963.50 0
1973-12-22 Acid Treatment 955.50 964.10 0
2002-12-18 Packing Device Capped w/Cement 867.00 945.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 2860 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References