X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084162903000

Well Details

Well ID: 0084162903000
Loading map...
Location: 00/03-29-008-16W4/0
Location Alias: 00/03-29-08-16 W4M
Location Alias 2: 00/03-29-008-16 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 16
Section: 29
County/Municipality: Municipal District of Taber
Well Name: CNRL TABER 3-29-8-16
Operator Name: Canadian Natural Resources Limited
License Number: 0024588
License Date: 1963-07-29
License Status: Abandoned
Spud Date: 1963-07-30
Final Drill Date: 1963-08-04
Well Total Depth: 1002.80 m
Surface Hole Latitude: 49.671346
Surface Hole Longitude: -112.141103

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-07-29 Obtained License
1963-08-04 Finished Drilling
1963-08-04 Well Mode changed to Drilled and Cased
1963-08-05 Production Casing Operation Performed
1963-08-11 Perforation Treatment Performed - Jet Perforation
1963-08-19 Well Began Production
1963-08-19 Well Fluid changed to Crude Oil
1963-08-19 Well Mode changed to Pumping
1963-09-06 Perforation Treatment Performed - Condensate Squeeze
1963-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-29 Perforation Treatment Performed - Jet Perforation
1968-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-11-27 Well Began Injection
1968-11-27 Well Fluid changed to Water
1968-11-27 Well Type changed to Injection
1973-06-22 Perforation Treatment Performed - Cement Squeeze
1973-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-24 Perforation Treatment Performed - Jet Perforation
1973-06-25 Perforation Treatment Performed - Fractured
1974-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-20 Perforation Treatment Performed - Jet Perforation
1974-01-21 Perforation Treatment Performed - Jet Perforation
1974-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-22 Perforation Treatment Performed - Cement Squeeze
1974-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-30 Well Fluid changed to Water
1998-05-30 Well Mode changed to Suspended
1998-05-30 Well Type changed to Injection
2003-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-04 Plug Back Performed
2003-11-04 Well Fluid changed to Water
2003-11-04 Well Log Performed
2003-11-04 Well Mode changed to Abandoned Zone
2003-11-04 Well Type changed to Injection
2013-11-16 Well Log Performed
2013-11-17 Perforation Treatment Performed - Jet Perforation
2013-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-22 Perforation Treatment Performed - Cement Plug
2013-11-22 Perforation Treatment Performed - Jet Perforation
2013-11-22 Well Log Performed
2013-11-24 Perforation Treatment Performed - Cement Plug
2013-11-24 Perforation Treatment Performed - Remedial Casing
2013-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-27 Plug Back Performed
2014-05-15 Well Abandoned
2014-05-15 Well Fluid changed to Water
2014-05-15 Well Mode changed to Abandoned
2014-05-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-08-11 Perforation 968.00 970.50 13
1973-06-25 Fracture 968.00 973.20 0
1974-01-20 Perforation 984.20 984.80 13
1974-01-20 Acid Treatment 984.20 984.80 0
1974-01-21 Perforation 984.20 984.80 13
1974-01-22 Acid Treatment 984.20 984.80 0
1974-01-22 Cement Squeeze 984.20 984.80 0
1974-01-24 Acid Treatment 968.00 973.20 0
2003-11-04 Packing Device Capped w/Cement 941.50 949.50 0
2013-11-17 Perforation 984.20 984.80 13
2013-11-22 Cement Plug 974.00 982.00 0
1963-09-06 Condensate Squeeze 968.00 970.50 0
2013-11-22 Packing Device Capped w/Cement 957.00 965.00 0
2013-11-22 Perforation 282.00 285.00 17
2013-11-22 Perforation 282.00 285.00 20
2013-11-22 Perforation 282.00 282.90 99
2013-11-24 Remedial Casing Cementing 282.00 285.00 0
2013-11-24 Cement Plug 279.00 285.00 0
2013-11-27 Packing Device Capped w/Cement 271.00 279.00 0
1963-09-22 Acid Treatment 968.00 970.50 0
1968-10-29 Perforation 969.90 971.40 13
1968-10-29 Perforation 972.00 973.20 13
1968-10-30 Acid Treatment 969.90 973.20 0
1973-06-22 Cement Squeeze 968.00 973.20 0
1973-06-24 Perforation 968.00 973.20 13
1973-06-24 Acid Treatment 968.00 973.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 427 0.0 0.0 0.0
1968 2283 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References