X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084162015000

Well Details

Well ID: 0084162015000
Loading map...
Location: 00/15-20-008-16W4/0
Location Alias: 00/15-20-08-16 W4M
Location Alias 2: 00/15-20-008-16 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 16
Section: 20
County/Municipality: Municipal District of Taber
Well Name: RENAISSANCE HORSEFLY 15-20-8-16
Operator Name: Husky Oil Operations Limited
License Number: 0024666
License Date: 1963-08-14
License Status: RecCertified
Spud Date: 1963-08-16
Final Drill Date: 1963-08-21
Well Total Depth: 1002.80 m
Surface Hole Latitude: 49.667553
Surface Hole Longitude: -112.135533

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-08-14 Obtained License
1963-08-21 Finished Drilling
1963-08-21 Well Mode changed to Drilled and Cased
1963-08-22 Drill Stem Test Performed
1963-08-22 Production Casing Operation Performed
1963-09-05 Perforation Treatment Performed - Bullet Perforation
1963-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-18 Perforation Treatment Performed - Fractured
1963-11-01 Well Began Production
1963-11-01 Well Fluid changed to Crude Oil
1963-11-01 Well Mode changed to Pumping
1976-12-01 Well Fluid changed to Crude Oil
1976-12-01 Well Mode changed to Suspended
1977-03-05 Well Fluid changed to Crude Oil
1977-03-05 Well Mode changed to Pumping
1994-04-30 Well Fluid changed to Crude Oil
1994-04-30 Well Mode changed to Suspended
1994-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-17 Perforation Treatment Performed - Jet Perforation
1994-05-17 Plug Back Performed
1994-05-17 Well Abandoned
1994-05-17 Well Fluid changed to Crude Oil
1994-05-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-09-05 Bullet Perforation 965.90 967.70 7
1963-09-05 Bullet Perforation 966.80 967.40 13
1963-09-05 Bullet Perforation 967.40 967.70 7
1963-10-08 Acid Treatment 965.90 967.70 0
1963-10-18 Fracture 965.90 967.70 0
1994-05-17 Packing Device Capped w/Cement 952.00 960.00 0
1994-05-17 Perforation 689.00 690.00 13
1994-05-17 Packing Device Capped w/Cement 671.00 679.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 742 0.0 0.0 0.0
1968 4257 0.0 0.0 0.0
1969 8476 0.0 0.0 0.0
1970 8700 0.0 0.0 0.0
1971 8677 0.0 0.0 0.0
1972 8337 0.0 0.0 0.0
1973 1278 0.0 0.0 0.0
1977 5913 0.0 0.0 0.0
1978 8031 0.0 0.0 0.0
1979 7127 0.0 0.0 0.0
1980 7807 0.0 0.0 0.0
1981 8001 0.0 0.0 0.0
1982 4544 0.0 0.0 0.0
1983 7292 0.0 0.0 0.0
1984 8379 0.0 0.0 0.0
1985 7185 0.0 0.0 0.0
1986 8532 0.0 0.0 0.0
1987 8537 0.0 0.0 0.0
1988 8033 0.0 0.0 0.0
1989 8636 0.0 0.0 0.0
1990 720 0.0 0.0 0.0
1992 2210 0.0 0.0 0.0

For data sources see[5]

References