X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084160109000

Well Details

Well ID: 0084160109000
Loading map...
Location: 00/09-01-008-16W4/0
Location Alias: 00/09-01-08-16 W4M
Location Alias 2: 00/09-01-008-16 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 16
Section: 01
County/Municipality: Municipal District of Taber
Well Name: ARROW POINT TABERSE 9-1-8-16
Operator Name: Taber Water Disposal Inc.
License Number: 0024710
License Date: 1963-08-21
License Status: Issued
Spud Date: 1963-08-28
Final Drill Date: 1963-09-04
Well Total Depth: 1005.20 m
Surface Hole Latitude: 49.620336
Surface Hole Longitude: -112.039623

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-08-21 Obtained License
1963-09-04 Finished Drilling
1963-09-04 Well Mode changed to Drilled and Cased
1963-09-05 Production Casing Operation Performed
1963-09-10 Perforation Treatment Performed - Acid Wash - No Pressure
1963-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-11 Perforation Treatment Performed - Jet Perforation
1963-09-21 Well Began Production
1963-09-21 Well Fluid changed to Crude Oil
1963-09-21 Well Mode changed to Pumping
2001-03-19 Well Fluid changed to Crude Oil
2001-03-19 Well Mode changed to Suspended
2002-05-18 Well Fluid changed to Crude Oil
2002-05-18 Well Mode changed to Pumping
2002-10-19 Well Fluid changed to Crude Oil
2002-10-19 Well Mode changed to Suspended
2009-11-07 Perforation Treatment Performed - Jet Perforation
2009-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-13 Well Fluid changed to Crude Oil
2009-11-13 Well Mode changed to Pumping
2012-08-01 Well Fluid changed to Crude Oil
2012-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-09-10 Acid Wash 966.80 969.60 0
1963-09-11 Perforation 966.80 967.10 7
1963-09-11 Perforation 967.10 967.40 13
1963-09-11 Perforation 968.70 969.00 13
1963-09-11 Perforation 969.00 969.60 7
1963-09-11 Acid Treatment 966.80 969.60 0
2009-11-07 Perforation 966.50 969.60 17
2009-11-08 Acid Treatment 966.50 969.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4294 0.0 0.0 0.0
1968 4382 0.0 0.0 0.0
1969 7924 0.0 0.0 0.0
1970 7860 0.0 0.0 0.0
1971 8607 0.0 0.0 0.0
1972 7227 0.0 0.0 0.0
1973 8706 0.0 0.0 0.0
1974 6807 0.0 0.0 0.0
1975 6928 0.0 0.0 0.0
1976 5647 0.0 0.0 0.0
1977 8334 0.0 0.0 0.0
1978 7986 0.0 0.0 0.0
1979 8726 0.0 0.0 0.0
1980 7649 0.0 0.0 0.0
1981 8340 0.0 0.0 0.0
1982 5143 0.0 0.0 0.0
1983 6944 0.0 0.0 0.0
1984 8582 0.0 0.0 0.0
1985 8665 0.0 0.0 0.0
1986 8362 0.0 0.0 0.0
1987 8689 0.0 0.0 0.0
1988 8696 0.0 0.0 0.0
1989 8669 0.0 0.0 0.0
1990 8659 0.0 0.0 0.0
1991 8472 0.0 0.0 0.0
1992 8633 0.0 0.0 0.0
1993 8721 0.0 0.0 0.0
1994 6680 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8396 0.0 0.0 0.0
1998 8732 0.0 0.0 0.0
1999 8716 0.0 0.0 0.0
2000 8741 0.0 0.0 0.0
2001 144 0.0 0.0 0.0
2002 3656 0.0 0.0 0.0
2009 537 0.0 0.0 0.0
2010 314 0.0 0.0 0.0

For data sources see[5]

References