X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084150606000

Well Details

Well ID: 0084150606000
Loading map...
Location: 00/06-06-008-15W4/0
Location Alias: 00/06-06-08-15 W4M
Location Alias 2: 00/06-06-008-15 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 15
Section: 06
County/Municipality: Municipal District of Taber
Well Name: CPOG TABERS 6-6-8-15
Operator Name: Ovintiv Canada ULC
License Number: 0024533
License Date: 1963-07-18
License Status: RecCertified
Spud Date: 1963-07-26
Final Drill Date: 1963-07-30
Well Total Depth: 997.30 m
Surface Hole Latitude: 49.616717
Surface Hole Longitude: -112.028204

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-07-18 Obtained License
1963-07-28 Drill Stem Test Performed
1963-07-30 Finished Drilling
1963-07-30 Well Mode changed to Drilled and Cased
1963-07-31 Production Casing Operation Performed
1963-08-05 Perforation Treatment Performed - Bullet Perforation
1963-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-08 Perforation Treatment Performed - Bullet Perforation
1963-08-15 Well Began Production
1963-08-15 Well Fluid changed to Crude Oil
1963-08-15 Well Mode changed to Pumping
1964-10-11 Perforation Treatment Performed - Fractured
1965-06-24 Perforation Treatment Performed - Bullet Perforation
1965-08-18 Perforation Treatment Performed - Cement Squeeze
1965-08-23 Perforation Treatment Performed - Bullet Perforation
1965-09-29 Well Fluid changed to Crude Oil
1965-09-29 Well Mode changed to Suspended
1966-05-06 Perforation Treatment Performed - Cement Plug
1966-05-06 Well Abandoned
1966-05-06 Well Fluid changed to Crude Oil
1966-05-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-08-05 Bullet Perforation 970.50 972.90 13
1963-08-07 Acid Treatment 970.50 972.90 0
1963-08-08 Bullet Perforation 973.50 974.80 13
1964-10-11 Fracture 970.50 974.80 0
1965-06-24 Bullet Perforation 976.90 978.10 13
1965-08-18 Cement Squeeze 973.50 978.10 0
1965-08-23 Bullet Perforation 970.50 972.90 13
1966-05-06 Cement Plug 925.70 975.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References