X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084093010002

Well Details

Well ID: 0084093010002
Loading map...
Location: 00/10-30-008-09W4/2
Location Alias: 00/10-30-08-09 W4M
Location Alias 2: 00/10-30-008-09 W4/02
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 09
Section: 30
County/Municipality: County of Forty Mile No. 8
Well Name: WESTCOAST ET AL MALEB 10-30-8-9
Operator Name: Devon Canada Corporation
License Number: 0040785
License Date: 1971-09-10
License Status: RecCertified
Spud Date: 1971-09-14
Final Drill Date: 1971-09-18
Well Total Depth: 702.60 m
Surface Hole Latitude: 49.678663
Surface Hole Longitude: -111.209734

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-09-10 Obtained License
1971-09-18 Drill Stem Test Performed
1971-09-18 Finished Drilling
1971-09-18 Well Mode changed to Drilled and Cased
1971-09-19 Production Casing Operation Performed
1971-11-12 Perforation Treatment Performed - Jet Perforation
1977-12-18 Well Began Production
1977-12-18 Well Fluid changed to Gas
1977-12-18 Well Mode changed to Flowing
1982-06-19 Perforation Treatment Performed - Cement Squeeze
1982-09-02 Perforation Treatment Performed - Cement Squeeze
1982-09-07 Perforation Treatment Performed - Jet Perforation
1982-09-07 Well Fluid changed to Gas
1982-09-07 Well Mode changed to Flowing
1982-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-07 Well Fluid changed to Gas
1983-09-07 Well Mode changed to Suspended
1998-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-29 Plug Back Performed
1998-05-29 Well Fluid changed to Gas
1998-05-29 Well Mode changed to Abandoned Zone
1998-06-02 Well Abandoned
1998-06-02 Well Fluid changed to Gas
1998-06-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-11-12 Perforation 678.50 680.90 13
1971-11-12 Perforation 686.40 689.20 13
1982-06-19 Cement Squeeze 686.40 689.20 0
1982-09-02 Cement Squeeze 678.50 680.90 0
1982-09-07 Perforation 678.50 680.90 13
1982-09-08 Acid Treatment 678.50 680.90 0
1982-09-08 Acid Treatment 678.50 680.90 0
1998-05-29 Packing Device Capped w/Cement 662.00 670.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 314 0.0 0.0 0.0
1978 4447 0.0 0.0 0.0
1979 4385 0.0 0.0 0.0
1980 4272 0.0 0.0 0.0
1981 4322 0.0 0.0 0.0
1982 1257 0.0 0.0 0.0

For data sources see[5]

References