If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0084092910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.678683,"lon":-111.186989,"icon":""}]} |
Location: 00/10-29-008-09W4/0 | |
Location Alias: 00/10-29-08-09 W4M | |
Location Alias 2: 00/10-29-008-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 008 | |
Meridian: 4 | |
Range: 09 | |
Section: 29 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: SLE GRANLEA 10-29-8-9 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0221609 | |
License Date: 1999-02-18 | |
License Status: Suspension | |
Spud Date: 1999-02-21 | |
Final Drill Date: 1999-02-25 | |
Well Total Depth: 982.00 m | |
Surface Hole Latitude: 49.678683 | |
Surface Hole Longitude: -111.186989 |
Date | Event |
---|---|
1999-02-18 | Obtained License |
1999-02-22 | Surface Casing Operation Performed |
1999-02-25 | Finished Drilling |
1999-02-25 | Production Casing Operation Performed |
1999-02-25 | Well Log Performed |
1999-02-26 | Rig Released |
1999-02-26 | Well Mode changed to Drilled and Cased |
1999-02-27 | Perforation Treatment Performed - Jet Perforation |
1999-02-27 | Well Log Performed |
1999-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-03-09 | Perforation Treatment Performed - Jet Perforation |
1999-03-09 | Plug Back Performed |
1999-03-09 | Well Log Performed |
1999-04-21 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-02-27 | Perforation | 938.00 | 939.00 | 13 |
1999-03-09 | Packing Device Capped w/Cement | 925.00 | 935.00 | 0 |
1999-03-09 | Perforation | 675.00 | 676.50 | 13 |
1999-03-09 | Perforation | 681.00 | 682.00 | 13 |
1999-04-21 | Fracture | 675.00 | 682.00 | 0 |
For data sources see[4]