X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084063510002

Well Details

Well ID: 0084063510002
Loading map...
Location: 00/10-35-008-06W4/2
Location Alias: 00/10-35-08-06 W4M
Location Alias 2: 00/10-35-008-06 W4/02
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 06
Section: 35
County/Municipality: Cypress County
Well Name: YANGARRA MEDICINE HAT 10-35-8-6
Operator Name: Yangarra Resources Corp.
License Number: 0301836
License Date: 2004-01-16
License Status: Abandoned
Spud Date: 2004-02-07
Final Drill Date: 2004-02-13
Well Total Depth: 1270.00 m
Surface Hole Latitude: 49.693322
Surface Hole Longitude: -110.712522

For data sources see[1][2]

Well History

Date Event
2004-01-16 Obtained License
2004-02-08 Surface Casing Operation Performed
2004-02-10 Direction Drilling Operation Performed - Deviate
2004-02-12 Well Log Performed
2004-02-13 Finished Drilling
2004-02-13 Well Log Performed
2004-02-13 Well Mode changed to Drilled and Cased
2004-02-14 Production Casing Operation Performed
2004-02-14 Rig Released
2004-04-07 Perforation Treatment Performed - Jet Perforation
2004-04-12 Perforation Treatment Performed - Jet Perforation
2004-04-14 Perforation Treatment Performed - Cement Squeeze
2004-04-14 Plug Back Performed
2004-04-17 Perforation Treatment Performed - Jet Perforation
2004-05-27 Well Began Production
2004-05-27 Well Fluid changed to Gas
2004-05-27 Well Mode changed to Flowing
2009-09-30 Well Fluid changed to Gas
2009-09-30 Well Mode changed to Suspended
2010-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-13 Perforation Treatment Performed - Jet Perforation
2010-07-13 Plug Back Performed
2010-07-13 Well Fluid changed to Gas
2010-07-13 Well Mode changed to Abandoned Zone
2010-08-21 Perforation Treatment Performed - Fractured
2018-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-18 Plug Back Performed
2019-01-02 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-02-10 955.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-04-07 Perforation 1241.00 1245.00 17
2018-12-18 Packing Device Capped w/Cement 822.00 830.00 0
2004-04-12 Perforation 1185.00 1189.00 17
2004-04-14 Cement Squeeze 1241.00 1245.00 0
2004-04-14 Cement Squeeze 1185.00 1189.00 0
2004-04-17 Perforation 1240.50 1241.50 17
2010-07-13 Packing Device Capped w/Cement 1227.00 1235.00 0
2010-07-13 Packing Device Capped w/Cement 1172.00 1180.00 0
2010-07-13 Perforation 838.00 842.00 13
2010-08-21 Fracture 838.00 842.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 5705 0.0 0.0 0.0
2005 5182 0.0 0.0 0.0
2006 7455 0.0 0.0 0.0
2007 1757 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References