If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0075012006002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.575523,"lon":-114.102904,"icon":""}]} |
Location: 00/06-20-007-01W5/2 | |
Location Alias: 00/06-20-07-01 W5M | |
Location Alias 2: 00/06-20-007-01 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 007 | |
Meridian: 5 | |
Range: 01 | |
Section: 20 | |
County/Municipality: Municipal District of Pincher Creek No. 9 | |
Well Name: COMPTON 11-20 DR BURMIS 6-20-7-1 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0288488 | |
License Date: 2003-06-16 | |
License Status: Issued | |
Spud Date: 2003-07-19 | |
Final Drill Date: 2003-08-25 | |
Well Total Depth: 2110.00 m | |
Surface Hole Latitude: 49.575523 | |
Surface Hole Longitude: -114.102904 |
Date | Event |
---|---|
2002-11-14 | Well Log Performed |
2003-06-16 | Obtained License |
2003-07-19 | Direction Drilling Operation Performed - Deviate |
2003-07-24 | Surface Casing Operation Performed |
2003-07-28 | Kick Occurred |
2003-08-11 | Well Log Performed |
2003-08-14 | Well Log Performed |
2003-08-15 | Intermediate Casing Operation Performed |
2003-08-17 | Well Log Performed |
2003-08-25 | Finished Drilling |
2003-08-25 | Well Log Performed |
2003-08-25 | Well Mode changed to Drilled and Cased |
2003-08-26 | Well Log Performed |
2003-08-27 | Liner Casing Operation Performed |
2003-08-30 | Rig Released |
2003-11-04 | Perforation Treatment Performed - Jet Perforation |
2003-11-05 | Perforation Treatment Performed - Jet Perforation |
2003-11-07 | Perforation Treatment Performed - Fractured |
2003-11-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-11-13 | Plug Back Performed |
2003-11-13 | Well Log Performed |
2003-11-14 | Perforation Treatment Performed - Fractured |
2003-11-14 | Perforation Treatment Performed - Jet Perforation |
2003-11-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-11-20 | Perforation Treatment Performed - Jet Perforation |
2003-11-20 | Plug Back Performed |
2003-11-20 | Well Mode changed to Abandoned Zone |
2003-11-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-11-21 | Plug Back Performed |
2003-11-27 | Perforation Treatment Performed - Jet Perforation |
2003-11-28 | Perforation Treatment Performed - Fractured |
2003-12-05 | Perforation Treatment Performed - Jet Perforation |
2004-04-13 | Well Log Performed |
2004-04-14 | Perforation Treatment Performed - Jet Perforation |
2004-04-30 | Perforation Treatment Performed - Jet Perforation |
2004-04-30 | Well Log Performed |
2004-05-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-05-03 | Perforation Treatment Performed - Remedial Casing |
2004-05-06 | Perforation Treatment Performed - Remedial Casing |
2004-06-15 | Well Log Performed |
2004-06-18 | Perforation Treatment Performed - Jet Perforation |
2004-06-18 | Well Log Performed |
2004-06-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-06-20 | Perforation Treatment Performed - Cement Plug |
2004-06-20 | Perforation Treatment Performed - Remedial Casing |
2004-06-23 | Perforation Treatment Performed - Jet Perforation |
2004-06-23 | Well Log Performed |
2004-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-06-26 | Perforation Treatment Performed - Cement Plug |
2004-06-26 | Perforation Treatment Performed - Remedial Casing |
2004-06-29 | Perforation Treatment Performed - Jet Perforation |
2004-06-29 | Well Log Performed |
2004-07-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-07-08 | Perforation Treatment Performed - Cement Plug |
2004-07-08 | Perforation Treatment Performed - Remedial Casing |
2006-12-12 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2003-07-19 | 100.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-11-04 | Perforation | 1995.00 | 2000.00 | 5 |
2003-11-14 | Fracture | 1885.00 | 1895.00 | 0 |
2003-11-20 | Packing Device Capped w/Cement | 1872.00 | 1880.00 | 0 |
2003-11-20 | Perforation | 1858.00 | 1864.00 | 17 |
2003-11-21 | Packing Device Capped w/Cement | 1837.00 | 1845.00 | 0 |
2003-11-27 | Perforation | 1766.50 | 1772.50 | 17 |
2003-11-28 | Fracture | 1766.50 | 1772.50 | 0 |
2003-12-05 | Perforation | 1729.50 | 1734.50 | 14 |
2004-04-14 | Perforation | 1657.00 | 1667.00 | 14 |
2004-04-14 | Perforation | 1658.50 | 1664.50 | 17 |
2004-04-30 | Perforation | 860.00 | 862.00 | 13 |
2003-11-04 | Perforation | 2001.00 | 2006.00 | 5 |
2004-04-30 | Perforation | 919.50 | 921.50 | 13 |
2004-05-02 | Acid Treatment | 860.00 | 862.00 | 0 |
2004-05-02 | Acid Treatment | 919.50 | 921.50 | 0 |
2004-05-03 | Remedial Casing Cementing | 919.50 | 921.50 | 0 |
2004-05-06 | Remedial Casing Cementing | 860.00 | 862.00 | 0 |
2004-06-18 | Perforation | 1575.00 | 1576.00 | 13 |
2004-06-18 | Perforation | 1604.00 | 1605.00 | 13 |
2004-06-19 | Acid Treatment | 1575.00 | 1576.00 | 0 |
2004-06-19 | Acid Treatment | 1604.00 | 1605.00 | 0 |
2004-06-20 | Remedial Casing Cementing | 1604.00 | 1605.00 | 0 |
2003-11-04 | Perforation | 2020.00 | 2025.00 | 5 |
2004-06-20 | Remedial Casing Cementing | 1575.00 | 1576.00 | 0 |
2004-06-20 | Cement Plug | 1567.00 | 1575.00 | 0 |
2004-06-23 | Perforation | 1350.00 | 1351.00 | 15 |
2004-06-23 | Perforation | 1375.00 | 1376.00 | 15 |
2004-06-25 | Acid Treatment | 1350.00 | 1351.00 | 0 |
2004-06-25 | Acid Treatment | 1375.00 | 1376.00 | 0 |
2004-06-26 | Remedial Casing Cementing | 1375.00 | 1376.00 | 0 |
2004-06-26 | Remedial Casing Cementing | 1350.00 | 1351.00 | 0 |
2004-06-26 | Cement Plug | 1299.60 | 1350.00 | 0 |
2004-06-29 | Perforation | 1258.00 | 1259.00 | 13 |
2003-11-04 | Perforation | 2028.00 | 2033.00 | 5 |
2004-06-29 | Perforation | 1267.00 | 1269.00 | 13 |
2004-07-07 | Acid Treatment | 1258.00 | 1259.00 | 0 |
2004-07-07 | Acid Treatment | 1267.00 | 1269.00 | 0 |
2004-07-08 | Remedial Casing Cementing | 1267.00 | 1269.00 | 0 |
2004-07-08 | Packing Device Capped w/Cement | 1259.00 | 1265.00 | 0 |
2004-07-08 | Remedial Casing Cementing | 1258.00 | 1259.00 | 0 |
2004-07-08 | Cement Plug | 1144.80 | 1258.00 | 0 |
2003-11-04 | Perforation | 2036.00 | 2041.00 | 5 |
2003-11-05 | Perforation | 1987.00 | 1995.00 | 5 |
2003-11-07 | Fracture | 1987.00 | 2033.00 | 0 |
2003-11-13 | Packing Device Capped w/Cement | 1942.00 | 1950.00 | 0 |
2003-11-14 | Perforation | 1885.00 | 1895.00 | 17 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2003-07-28 | Kick | 1209.00 | 1801.00 |
For data sources see[6]