X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0074200807004

Well Details

Well ID: 0074200807004
Loading map...
Location: 00/07-08-007-20W4/4
Location Alias: 00/07-08-07-20 W4M
Location Alias 2: 00/07-08-007-20 W4/04
Country: Canada
Province: Alberta
Township: 007
Meridian: 4
Range: 20
Section: 08
County/Municipality: Lethbridge County
Well Name: SOC COALDALE 7-8-7-20
Operator Name: AlphaBow Energy Ltd.
License Number: 0241680
License Date: 2000-09-06
License Status: Issued
Spud Date: 2000-09-21
Final Drill Date: 2000-09-22
Well Total Depth: 950.00 m
Surface Hole Latitude: 49.542506
Surface Hole Longitude: -112.674856

For data sources see[1][2]

Well History

Date Event
2000-09-06 Obtained License
2000-09-21 Surface Casing Operation Performed
2000-09-22 Finished Drilling
2000-09-22 Well Log Performed
2000-09-22 Well Mode changed to Drilled and Cased
2000-09-23 Production Casing Operation Performed
2000-09-23 Rig Released
2000-09-23 Well Log Performed
2000-10-18 Perforation Treatment Performed - Jet Perforation
2000-10-18 Well Log Performed
2000-10-22 Perforation Treatment Performed - Fractured
2000-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-25 Perforation Treatment Performed - Jet Perforation
2000-10-25 Plug Back Performed
2000-10-28 Well Log Performed
2000-10-31 Perforation Treatment Performed - Fractured
2000-11-10 Perforation Treatment Performed - Jet Perforation
2000-11-10 Well Log Performed
2000-11-13 Perforation Treatment Performed - Fractured
2000-11-28 Perforation Treatment Performed - Jet Perforation
2000-11-28 Well Log Performed
2000-11-28 Well Mode changed to Drilled and Cased
2000-11-30 Perforation Treatment Performed - Fractured
2000-12-21 Well Began Production
2000-12-21 Well Fluid changed to Gas
2000-12-21 Well Mode changed to Flowing
2002-02-05 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-10-18 Perforation 925.00 927.50 20
2000-11-30 Fracture 828.50 830.50 0
2000-10-22 Fracture 925.00 927.50 0
2000-10-25 Packing Device Capped w/Cement 912.00 920.00 0
2000-10-25 Perforation 881.00 884.00 13
2000-10-25 Perforation 884.00 887.00 13
2000-10-31 Fracture 881.00 887.00 0
2000-11-10 Perforation 842.80 844.80 13
2000-11-13 Fracture 842.80 844.80 0
2000-11-28 Perforation 828.50 830.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 258 0.0 0.0 0.0
2001 8359 0.0 0.0 0.0
2002 739 0.0 0.0 0.0

For data sources see[5]

References