X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0074160903000

Well Details

Well ID: 0074160903000
Loading map...
Location: 00/03-09-007-16W4/0
Location Alias: 00/03-09-07-16 W4M
Location Alias 2: 00/03-09-007-16 W4/00
Country: Canada
Province: Alberta
Township: 007
Meridian: 4
Range: 16
Section: 09
County/Municipality: County of Warner No. 5
Well Name: CNRL TABERS 3-9-7-16
Operator Name: Canadian Natural Resources Limited
License Number: 0048181
License Date: 1973-11-30
License Status: Issued
Spud Date: 1973-12-10
Final Drill Date: 1973-12-15
Well Total Depth: 1008.90 m
Surface Hole Latitude: 49.540641
Surface Hole Longitude: -112.117699

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-11-30 Obtained License
1973-12-15 Finished Drilling
1973-12-15 Well Mode changed to Drilled and Cased
1973-12-16 Drill Stem Test Performed
1973-12-17 Production Casing Operation Performed
1974-01-22 Perforation Treatment Performed - Jet Perforation
1974-01-22 Perforation Treatment Performed - Selective Jet Perforations
1974-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-25 Perforation Treatment Performed - Jet Perforation
1974-01-25 Perforation Treatment Performed - Selective Jet Perforations
1974-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-27 Perforation Treatment Performed - Fractured
1974-02-06 Well Began Production
1974-02-06 Well Fluid changed to Crude Oil
1974-02-06 Well Mode changed to Pumping
2006-09-30 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-01-22 Perforation 990.90 991.50 3
1974-01-22 Selective Jet Perforations 981.80 983.60 0
1974-01-24 Acid Treatment 981.80 991.50 0
1974-01-25 Perforation 978.10 978.70 3
1974-01-25 Selective Jet Perforations 979.60 979.90 0
1974-01-25 Selective Jet Perforations 981.50 983.30 0
1974-01-26 Acid Treatment 978.10 991.50 0
1974-01-27 Fracture 978.10 991.50 0
2006-09-30 Perforation 978.00 992.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 4898 0.0 0.0 0.0
1975 2318 0.0 0.0 0.0
1976 6261 0.0 0.0 0.0
1977 6598 0.0 0.0 0.0
1978 7742 0.0 0.0 0.0
1979 8460 0.0 0.0 0.0
1980 6704 0.0 0.0 0.0
1981 7950 0.0 0.0 0.0
1982 5168 0.0 0.0 0.0
1983 7178 0.0 0.0 0.0
1984 8691 0.0 0.0 0.0
1985 8494 0.0 0.0 0.0
1986 8549 0.0 0.0 0.0
1987 8739 0.0 0.0 0.0
1988 8769 0.0 0.0 0.0
1989 8604 0.0 0.0 0.0
1990 8615 0.0 0.0 0.0
1991 8747 0.0 0.0 0.0
1992 8627 0.0 0.0 0.0
1993 8737 0.0 0.0 0.0
1994 8748 0.0 0.0 0.0
1995 8726 0.0 0.0 0.0
1996 8722 0.0 0.0 0.0
1997 8680 0.0 0.0 0.0
1998 8541 0.0 0.0 0.0
1999 8630 0.0 0.0 0.0
2000 8757 0.0 0.0 0.0
2001 8700 0.0 0.0 0.0
2002 8539 0.0 0.0 0.0
2003 8690 0.0 0.0 0.0
2004 7942 0.0 0.0 0.0
2005 8755 0.0 0.0 0.0
2006 8376 0.0 0.0 0.0
2007 8360 0.0 0.0 0.0
2008 8674 0.0 0.0 0.0
2009 8730 0.0 0.0 0.0
2010 8655 0.0 0.0 0.0
2011 8704 0.0 0.0 0.0
2012 8650 0.0 0.0 0.0
2013 8733 0.0 0.0 0.0
2014 8655 0.0 0.0 0.0
2015 8078 0.0 0.0 0.0
2016 7586 0.0 0.0 0.0
2017 8567 0.0 0.0 0.0
2018 8069 0.0 0.0 0.0
2019 7382 0.0 0.0 0.0
2020 1677 0.0 0.0 0.0

For data sources see[5]

References