X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0074092906000

Well Details

Well ID: 0074092906000
Loading map...
Location: 00/06-29-007-09W4/0
Location Alias: 00/06-29-07-09 W4M
Location Alias 2: 00/06-29-007-09 W4/00
Country: Canada
Province: Alberta
Township: 007
Meridian: 4
Range: 09
Section: 29
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF 40MILE 6-29-7-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0076752
License Date: 1979-07-05
License Status: Abandoned
Spud Date: 1979-07-09
Final Drill Date: 1979-07-12
Well Total Depth: 974.00 m
Surface Hole Latitude: 49.588189
Surface Hole Longitude: -111.193465

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-05 Obtained License
1979-07-12 Finished Drilling
1979-07-12 Well Mode changed to Drilled and Cased
1979-07-14 Production Casing Operation Performed
1979-08-10 Perforation Treatment Performed - Jet Perforation
1979-11-05 Well Began Production
1979-11-05 Well Fluid changed to Gas
1979-11-05 Well Mode changed to Flowing
1986-05-08 Perforation Treatment Performed - Jet Perforation
1986-06-11 Well Fluid changed to Gas
1986-06-11 Well Mode changed to Flowing
1992-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-25 Plug Back Performed
1992-02-25 Well Fluid changed to Gas
1992-02-25 Well Mode changed to Abandoned Zone
1992-02-26 Perforation Treatment Performed - Jet Perforation
1992-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-27 Plug Back Performed
1992-03-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-10 Perforation 936.50 938.00 10
1986-05-08 Perforation 677.00 679.00 13
1992-02-25 Packing Device Capped w/Cement 910.80 920.80 0
1992-02-26 Perforation 654.50 655.50 13
1992-02-27 Packing Device Capped w/Cement 662.00 670.00 0
1992-02-27 Packing Device Capped w/Cement 637.00 645.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 888 0.0 0.0 0.0
1980 6713 0.0 0.0 0.0
1981 6597 0.0 0.0 0.0
1982 6265 0.0 0.0 0.0
1983 6308 0.0 0.0 0.0
1984 4577 0.0 0.0 0.0
1985 2335 0.0 0.0 0.0
1986 7788 0.0 0.0 0.0
1987 7798 0.0 0.0 0.0
1988 8079 0.0 0.0 0.0
1989 8565 0.0 0.0 0.0
1990 5557 0.0 0.0 0.0
1991 165 0.0 0.0 0.0

For data sources see[5]

References